<br />. VIII. CONSTRUCTION COST ESTIMATES <br /> <br />The Colorado Water Conservation Board estimated construction costs for the two <br />alternative mitigation plans, The cost estimates for alternatives 1 and 2 are presented in <br />Tables 1 and 2 for planning and feasibility evaluation purposes, The quantities, unit <br />costs, and engineering costs presented in Tables 1 and 2 are preliminary, The cost <br />estimates do not include potential costs for right-of-way acquisition, easements, and <br />utility relocations. The actual project cost will vary depending on the selected alternative, <br />the final project design quantities, contractor availability and costs, and materials <br />availability and costs, <br /> <br />IX, FINAL DESIGN <br /> <br />This report presents the results of the flood hazard mitigation study that was performed at <br />the request of the City of Walsenburg, Once a plan of improvement is chosen, the City of <br />Walsenburg will need to acquire the services of a consulting engineering firm should they <br />desire to proceed with the implementation of the plan. Final design drawings, <br />construction specifications, and a final cost estimate will need to be prepared for the <br />project prior to construction. <br /> <br />. <br /> <br />. <br /> <br />8 <br />