Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />TIME <br /> <br />Day 0 <br /> <br />1 <br /> <br />2 <br /> <br />3 <br /> <br />4 <br /> <br />5 <br /> <br />6 <br /> <br />7 <br /> <br />NOTES: <br /> <br />8-8 <br /> <br />OURAY RANCH PROJECT <br />PHASE 2 <br /> <br />100 YR SNOW MELT ROUTING <br />FIGURE 1 <br />CASE 1 <br /> <br />AVERAGE (1) <br />INFLOW <br />I t <br /> <br />AVERAGE (3) <br />OUTFLOW <br />o t <br /> <br />STORAGE <br />CHANGE <br />Qt <br /> <br />2600cfs <br /> <br />1600cfs <br /> <br />+1983a-f <br /> <br />3200 <br /> <br />2600 <br /> <br />+1190 <br /> <br />3850 <br /> <br />3200 <br />(3800) (4) <br /> <br />+1289 <br />(+100) <br /> <br />4300 <br /> <br />4000 <br />(3800) <br /> <br />+ 595 <br />(+992) <br /> <br />3850 <br /> <br />4000 <br />(3800) <br /> <br />(-297) <br />(+100) <br /> <br />3000 <br /> <br />4000 <br />(3600) <br /> <br />(-1983) <br />(-1190) <br /> <br />2600 <br /> <br />3000 <br /> <br />(-793) <br /> <br />TOTAL <br />STORAGE <br />S <br /> <br />536,185 <br /> <br />538,168 <br /> <br />539,359 <br /> <br />540,647 <br />(539,456) <br /> <br />541,242 <br />(540,450) <br /> <br />540,945 <br />(540,550) <br /> <br />538,962 <br />(539,360) <br /> <br />538,169 <br />(538,567) <br /> <br />RESERVOIR (2) <br />LEVEL <br />h <br /> <br /> <br />8279.50 <br /> <br />79.78 <br /> <br />79.94 <br /> <br />80.12 <br />( 79.96) <br /> <br />80.21 <br />( 80.10) <br /> <br />80.17 <br />( 80.11) <br /> <br />79.89 <br />( 79.94) <br /> <br />79.78 <br />( 79.83) <br /> <br />1) Average Daily Snow melt Flow = 95% daily peak, to <br />reflect periodic snow melt reductions during <br />nighttime. <br /> <br />2) Based on reservoir capacity curve, average change <br />in storage per 0.1 ft of reservoir change between <br />elevation 8275 and 8280 is 714.5a-f. <br /> <br />3) Outflows are selected to anticipate inflow, gen- <br />erally stay within reservoir operating policies, <br />and minimize sudden releases down stream. <br /> <br />4) Alternate computations based on different outflow <br />selection are shown in parenthesis. <br />