<br />I <br /> <br />I <br /> <br />IX. IMPROVEMENT COSTS <br /> <br />Table 31. Summary of Unit Costs for Construction (1982). <br /> <br />I <br /> <br />Construction costs for the alternative improvement plans were developed <br /> <br /> <br />based on unit costs obtained from 1980 construction cost estimates. Costs <br /> <br /> <br />were assumed to adequately represent 1982 construction costs due to the <br /> <br />recessed economy over this period. A summary of the unit costs is presented <br /> <br /> <br />in Table 31. All unit costs include labor and overhead for the construction <br /> <br /> <br />item. Quantities were estimated for each alternative on a reach-by-reach <br /> <br /> <br />basis. Included in the cost estimates are costs for land acquisition and <br /> <br /> <br />legal, administrative and engineering fees. Land acquisition costs were <br /> <br /> <br />assumed to be $10,000 per acre. Annual operation and maintenance were $0.60 <br /> <br />per linear foot for vegetated channels, $0.26 per li.near foot for natural <br /> <br /> <br />channels and $72.00 per surface acre for detention ponds. <br /> <br /> <br />The detailed quantity and cost estimates for each alternative on a reach- <br /> <br /> <br />by-reach basis are presented in the Technical Addendum. Tables 32 through 34 <br /> <br /> <br />summarized the estimated costs for each improvement alternative on a reach-by- <br /> <br /> <br />reach basis. The summary tables include total costs, annual costs, annual <br /> <br /> <br />operation and maintenance, and total annual costs. Annual costs are based on <br /> <br /> <br />a 50-year project life with a 7 3/8 percent discount rate. <br /> <br /> <br />The cost estimates do not include costs for improvements along the <br /> <br />I <br /> <br />I <br /> <br />tributaries. <br /> <br /> Unit Cost <br />Item (installed) <br />Excavation $ 3 per cubic yard <br />Gabion 90 per cubic yard <br />Backfill 2 per cubic yard <br />Structural Fill 3 per cubic yard <br />Seeding and mulching 0.08 per square foot <br />Trickle Channel 34 per linear foot <br />Concrete for channel lining 250 per cubic yard <br />Roadway (Asphalt & Base) 6 per square yard <br />Riprap 50 per cubic yard <br />Bridge 60 per square foot <br /> of deck <br />Culverts: 48 inch CMP 40 per linear foot <br /> 2 5'xl0' 1400 per linear foot <br /> 3 - 3'x8' 1000 per linear foot <br /> 2 - 4'x7' 700 per linear foot <br /> 1 4'x10' 550 per linear foot <br /> 2 - 4'xl0' 1000 per linear foot <br /> 3 4'x10' 1500 per linear foot <br /> 4 4'xl0' 1900 per linear foot <br /> 1 - 4'x12' 600 per linear foot <br /> 8 - 4'x12' 4000 per linear foot <br /> 2 - 4'x12' 1100 per linear foot <br /> 4 - S'x10' 2400 per linear foot <br /> 3 6'xS' 1800 per linear foot <br /> 4 - 6'x8' 2300 per linear foot <br /> 1 - 6'xl0' 800 per linear foot <br /> 2 6'xl0' 1500 per linear foot <br /> 4 6'xl0' 2900 per linear foot <br /> 1 - 6'x12' 900 per linear foot <br /> 2 6'x12' 1700 per linear foot <br />Fencing (chain link) 16 per linear foot <br />Drop Structure 45600 <br />Erosion Control Structure 33500 <br />Annual O&M <br />Grasslined Channel 0.60 per linear foot <br />Natural Channel 0.26 per linear foot <br />Detention Ponds 72 per surface acre <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />63 <br />