My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD09450
CWCB
>
Floodplain Documents
>
Backfile
>
8001-9000
>
FLOOD09450
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 10:09:17 AM
Creation date
10/5/2006 4:20:05 AM
Metadata
Fields
Template:
Floodplain Documents
County
Logan
Community
Sterling
Stream Name
Sand Creek, Pawnee Creek overflow
Basin
South Platte
Title
Summary Report Floodplain Information
Date
1/1/1987
Prepared For
Sterling
Prepared By
Charles F. Leaf, PE
Floodplain - Doc Type
Floodplain Report/Masterplan
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
50
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br />, <br />J <br />. <br />. <br />I <br />II <br />t1 <br />J <br />q <br />, <br />rEI <br />lJ <br />II <br />Ii <br />iI <br />fI <br />l <br />. <br />1 <br />I <br />, <br /> <br />, . <br /> <br />Reach A <br /> <br />ReachS <br /> <br />ReaCh C <br /> <br />~ea,:'1 () <br /> <br />fTEM <br /> <br />1 <br />2 <br />J <br /> <br />1 <br />2 <br />J <br />4 <br />5 <br /> <br />I <br />2 <br />J <br />4 <br />5 <br /> <br />Pioneer Park <br />I <br />2 <br />J <br /> <br />ReathE <br /> <br />All Reaches <br />I <br /> <br />1 <br /> <br />TABLE 19 <br /> <br />PRELiMiNARY COST EST1MATE: PIONEER DITCH RELOCATIO~ <br />AND IMPROVEMENTS (WITH RIVERSIDE, PlONEER PARK, <br />AIIDPIONEERllliETENTlOtlSTRUCTURES) <br /> <br />DESCRIPTION <br /> <br />1 <br />2 <br /> <br />Cllannel lm~fovements <br />SNRR Crossing <br /> <br />Charme! Improve~nts <br />Phelps St. Crossing <br />Highway 14 crossing <br /> <br />Channel lmprove~ents <br />Crossing <br />Channel Relocation <br />No.7thAve.Crossin!j <br />Dewatering <br /> <br />Channel Relocatfon <br />Crossing <br />Cllonnell.nprovellll!nts <br />Sidney Ave. Crossing <br />Oewaterlng <br /> <br />II Oetention Pond & <br />Excavation <br />landscaping <br />Land Purcndse <br /> <br />QUANTITY <br /> <br />2,200LF <br />1 <br /> <br />2,850lF <br />1 <br />1 <br /> <br />2,600LF <br />1 <br />4,200lF <br />1 <br />4,200LF <br /> <br />4,OOOlF <br />1 <br />2,750 IF <br />1 <br />2.750lF <br /> <br />Recreation Arl'a <br />200.000ey <br />80 Acres <br />80 AcrE!s <br /> <br />Channel1mpro'/ements <br /> <br />Easement Purchase <br /> <br />4,1COLF <br /> <br />40AC <br /> <br />UNIT <br />COST <br /> <br />S9/lF <br />L.S. <br /> <br />SlO/LF <br />L.S. <br />L.S. <br /> <br />S12/LF <br />L.S. <br />$40/LF <br />L.S. <br />S15/LF <br /> <br />S41/LF <br />loS. <br />S10/LF <br />loS. <br />SlO/LF <br /> <br />S31CY <br />S501J0/AC <br />SSOOO/Ac <br /> <br />SlO/lF <br /> <br />,otal Construction Cost <br /> <br />SSOOO/AC <br /> <br />Enyineering anQ Cont1ngenCles <br /> <br />Leqa 1, fisc,} 1, ..nd kdmi nj ~ trdt j ve <br /> <br />;o,,\lC:::S, <br /> <br />"' <br /> <br /> <br />TOTAL <br />COST <br /> <br />$19.800.00 <br />134,250.00 <br /> <br />28.500.00 <br />134,000.00 <br />275,000.00 <br /> <br />31,200.00 <br />226.500.00 <br />168,000.00 <br />302,000.00 <br />63.000.00 <br /> <br />164,000.00 <br />276,000.00 <br />27,500.00 <br />134.000.00 <br />27.500.00 <br /> <br />600,000.00 <br />'00,000.00 <br />'00,000.00 <br /> <br />41,000.00 <br /> <br />200,000.00 <br />$3,652,250.00 <br />730,450.00 <br />219.135.00 <br /> <br />54,601.835.0C <br />
The URL can be used to link to this page
Your browser does not support the video tag.