Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />Level of Protection. Ar... of prot.ction were identifi.d conforlling <br />to the three subareas r.ferr.d to throughout the .tudy. Both lOO.year .nd <br />SOO-y..r d..ign lev... were .v.luat.d for .11 thr.. .ub.r.... <br /> <br />Lev.. Alia_.nt. Four l.v.. .Ugnmentl v.re .valuat.d b.s.d on the <br />loc.tion of .xl8ting development and .ound .ngin.ering judpant. Th. <br />.lignment. and the .ub.re.. they protect .re .hown on pl.ta 3. <br /> <br />lIh.rever pos81ble, leve.. were pl.c.d betw..n the riv.r channel .nd <br />the .xi.ting d.v.lopment to prot.ct the maximum numb.r of ho.e.. busi- <br />ness.s, .nd industri.s. lIhere development occurred too clos. to the riv.r <br />to perllit the construction of ..rth-b.llIed l.v.... floodvdb vera us.d. <br />Engine.ring judgment .nd fi.ld obs.rv.tions vera .pplied throughout the <br />process to identify vi.bl. .lignment.. <br /> <br />Hydr.uUc. . Levee .Ugnments 1. 2, and 3 encro.ch into the FIS <br />floodv.y to som. degr.. .s .hown. Lev.. .lignment 1 .ncro.ch.. .lightly <br />into the floodv.y upstr... from the r.ilro.d bridg.. Lev.. .lignment 3 <br />.ncro.ch.. ..v.r.l hundr.d f.et into the floodv.y .. it follow. the <br />exl8t1ng lev... Both lev.. .Ugnment. 2 and 3 .ncro.ch into the noodv.y <br />betw..n the U.S. Highw.y 2 bridge and the r.ilro.d bridge. Encro.chment <br />in the .rea between the bridges had minor eff.cts on the v.ter .urfac. <br />profiles. Lev.e alignment 3 provide. the high..t increa.e in water <br />surface.-O.4 foot; however, Montana floodvay requirement. specify that a <br />maxilDUll water surfac. increase of 0.5 foot 18 acc.ptable. lIh.n the <br />O.4-foot ris. is considered with the f.ct that the floodvay .ncroachment <br />for the l.ft bank was not present, it beco.... appar.nt that the levee <br />alignments propos.d may violate thb floodvay regulation. Approvel of <br />these plans may be subject to studie. ahowing that the noodw.y with the <br />proposed levee .lignment does not exceed Montana floodvay criteria or to <br />an exemption to the floodvay criteria may b. needed. <br /> <br />25 <br />