Laserfiche WebLink
<br />BID FORHS <br />Page 2 <br /> <br />BIDDER <br /> <br />Item <br />~ umber <br /> <br />Description <br /> <br />Estimated <br />Qu ant Hy <br /> <br />Unit <br /> <br />UnH <br />Cost <br /> <br />Total <br />Cost <br /> <br />~02 <br /> <br />Cast-in-place reinforced <br />concrete transition <br />structure, 7-1/2 foot wall s <br />(STA 23+75 to 24+38) <br /> <br />L,S. <br /> <br />400 Relocate 6-i nch 3 @ 30 I..F, <br /> water line <br /> ----,----- <br />500 Install 12-inch PVC pipe 3 @ 50 L.F, <br />600 Mobil i zati on and L,S. <br /> provision of field <br /> off ice facil ities <br /> -'- --..---- <br />700 Overexcavation and (See Note 1 ) C. Y. <br /> replacement wi th <br /> granular material <br /> <br />701 <br /> <br />Install select back fill <br />materidl <br /> <br />(See Note 1) Tons <br /> <br />702 <br /> <br />Install classified <br />backfill materidl <br /> <br />(See Note 1) Tons <br /> <br />TOTAL BID AMOUn <br /> <br />$ <br /> <br />BIDDER <br /> <br />Non 1: <br /> <br />Item Numbers 200, 201, 700, 701, and 702 are not quantified. Each <br />bidder shall inspect the project site to estimate, for themselves, <br />approximate quantities of tl1E?Se items. Payment Ivill be based on the <br />provisions included in the Bid Item description and measurement and <br />payment. <br />