My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD09416
CWCB
>
Floodplain Documents
>
Backfile
>
8001-9000
>
FLOOD09416
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 10:09:10 AM
Creation date
10/5/2006 4:18:46 AM
Metadata
Fields
Template:
Floodplain Documents
County
Ouray
Community
Ouray
Stream Name
Portland Creek
Basin
Gunnison
Title
Contract Documents for Debris and Flood Control Improvements Portland Creek, Phase II
Date
7/1/1987
Prepared For
Ouray
Prepared By
Simons Li & Associates Inc.
Floodplain - Doc Type
Project
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
145
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />other related and necessary materia'ls, wack, and equipment required to <br />construct the pipe in accordance with the Drawings and Specifica';ions, <br /> <br />Item No, 600 MOBILIZATIUN AliD PROVISION OF FIELD OFFICE FACILITIES, No <br />que,ntity measurement i~ill be made for ar1,Y materials or work required to <br />complete this item, The lump SU,11 price bid for mobilization and provision of <br />fiE,ld office facilities shall include all of the Contractor's costs of what- <br />SOEver nature to mobilize and set up field office facilities. The price bid <br />shall include: furnishing, transporting, and install ing field office <br />facilities; all permits; mobilizing for the proposed improvelllents; and any <br />oUer related an,j necessary materials" wor~:, and equipment to mobilize and <br />prcvide field office facilities, <br /> <br />Item No. 700 OVEREXCAVATION FOR STABILIZATION. No quantity estimate has <br />beEn maoe for thiS ltem, The measurenien'f-Tor payment of this item shall be <br />thE total number of cubi c yards of materi a.'1 requi red to be excavated as <br />outl i ned in these specifi cati ons measuredi n truck loads haul ed from the site, <br />approved by the Engi neer, <br /> <br />The unit price per cubic yard shall be the complete cost of the Contractor to <br />perfonll tile excal/ation. The price shan include: excavation, except rock <br />excavation, to the extent directed by the Engineer; disposal of excess exca- <br />vated materials 'in an approved location; n~placement with suitable backfin <br />material to provide a suitable foundation, including compaction, and any <br />related and necessary materials, work and eqll'ipment required to eiccomplish the <br />overexcavation and replacement of granular material as required. <br /> <br />I tem No, 701 and 702 FU RN ISH AND [i~STALL SELECT AND CLASS I F'I ED BACKF I LL <br />~1ATERIAL. The measurement for payment of thE time -Shall be the total nUr.lber <br />-Ol'tons, in place, of backfill material reqllil^ed to complete the ",ork based on <br />scale tickets or other method approved by the Engineer, <br /> <br />The unit price per cubic yard shall be the complete cost of the Contractor to <br />furnish and install backfill material. The pI-ice shall include: excavation, <br />haul, placement and compaction of the backfill material, and any related and <br />necessary material, work and equipment l-equin~d to accomplish the placement of <br />baccfill material, <br />
The URL can be used to link to this page
Your browser does not support the video tag.