Laserfiche WebLink
<br /> <br />II <br /> <br />IJ1 <br /> <br />-r:r <br />1'8 <br /> <br />(5) Property owners.will be paid or reimbursed for necessary <br />) expenSes as specified in Sections 303 and 304 of said Act. <br /> <br />b, Hold and saVe the United States free from damages due to' <br />water-rights claims resulting from co~struction and operation of the Project; <br /> <br />c . Prevent encroachment on the flow-carrying capacity of the. <br />Bear Creek Channel below the reservoi! and the South Platte River Channel below <br />the confluence of Bear Creek to the e~tent necessary to provide for effective <br />reservoir operation in the interest of flood control. The area required for <br />the flow-carrying capacity is more fully described in paragraph 3, below, <br />The extent of channel covered by this agreement is the Bear Creek Channel <br />from immediately below the darn to the confluence with the South Platte River <br />and that portion of' the South Platte River Channel extending to Hampden Avenue. <br />The following will be considered as m~nimum action required to fulfill the. <br />obligations of preventing encroachments. <br /> <br />(1) Prevent man-made encroachment~ such as dumping or <br />wasting. of materials in the channel. <br /> <br />(2) Insure that accumulations of debris around structures <br />'in. the 'channel such as bridges and we~rs will be removed promptly following <br />a flood, <br /> <br />(3) Control all aHerationsof the channel such as re'- <br />locating, constricting, enlarging, placing of erosion protection and raising <br />or lowering of the adjacent stream bapks, Alterations which provide for equal <br />or greater channel capacity will be permitted but must be preceded by adequate <br />plans defining the proposed alterations, A set of plans must be submitted to <br />the Government for review and written concurrence before initiation of the <br />channel alterations. A current file of plans showing channel alterations m.ust <br />be maintained, <br /> <br />d, <br />that the Project <br /> <br />Adequately inform affected interests, at least <br />will not provide complete flood protection; and <br /> <br />annually, <br /> <br />e, Provide guidance and leadership in preventing unwise and <br />uneconomical future development of the flood plain areas by encouraging prudent <br />use of floodproofing, land regulation planning, or other flood plain management <br />techniques to reduce future flood losses. <br /> <br />2. The Board hereby gives the Government a right to enter upon, at <br />reasonable times and in a reasonable manner, lands which the Board owns or <br />controls, for access to the Project for the purpose of inspection, and for the <br />purpose 'of maintaining the Project, if such inspection shows that the Board <br />.for any reason is failing to maintain the Project in accordance with the <br />. - - -- -c--______a s s ur a nc e s_her.eunde r _a nd -has-pe r-s-is-ted-i-n-s uc-h-f-a-i-lu-Fe-aflCe r-a-r e a s onab-le-no tic e <br />in writing by the Government delivered to the Chairml;ln of the Board~ No <br /> <br />, <br /> <br />2 <br />