Laserfiche WebLink
<br />2 <br /> <br />Location <br /> <br />Existing BFE <br />(feet)* <br /> <br />Modified BFE <br />(feet)* <br /> <br />Approximately 900 feet upstream of the <br />confluence with Cherry Creek <br />Just downstream of Lincoln Avenue <br />Just upstream of Lincoln Avenue <br />Just downstream of Jordan Road <br />Just upstream of Jordan Road <br />Approximately 2,000 feet upstream of <br />Jordan Road <br /> <br />5,781 <br />5,803 <br />5,804 <br />5,815 <br />5,819 <br /> <br />5,835 <br /> <br />5,781 <br />5,807 <br />5,808 <br />5,820 <br />5,821 <br /> <br />5,835 <br /> <br />*Nationa1 Geodetic Vertical Datum, rounded to nearest whole foot <br /> <br />Under the above-mentioned Acts of 1968 and 1973, the Mitigation <br /> <br />Directorate must develop criteria for floodplain management. <br /> <br />For the <br /> <br />community to participate in the National Flood Insurance Program (NFIP), the <br /> <br />community must use the modified BFEs to administer the floodplain management <br /> <br />measures of the NFIP. These modified BFEs will also be used to calculate the <br /> <br />appropriate flood insurance premium rates for new buildings and their <br /> <br />contents and for the second layer of insurance on existing buildings and <br /> <br />contents. <br /> <br />Upon the second publication of notice of these changes in this <br /> <br />newspaper, any person has 90 days in which he or she can request, through the <br /> <br />Chief Executive Officer of the community, that the Mitigation Directorate <br /> <br />reconsider the determination. Any request for reconsideration must be based <br /> <br />on knowledge of changed conditions or new scientific or technical data. All <br /> <br />interested parties are on notice that until the 90-day period elapses, the <br /> <br />Mitigation Directorate's determination to modify the BFEs may itself be <br /> <br />changed. <br />