My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD09313
CWCB
>
Floodplain Documents
>
Backfile
>
8001-9000
>
FLOOD09313
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 10:08:49 AM
Creation date
10/5/2006 4:11:19 AM
Metadata
Fields
Template:
Floodplain Documents
County
Denver
Community
Denver
Stream Name
Marston Lake North
Basin
South Platte
Title
Major Drainageway Planning
Date
10/1/1979
Prepared For
Denver
Prepared By
UDFCD
Contract/PO #
&&
Floodplain - Doc Type
Floodplain Report/Masterplan
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Commentary on Sheet 10 <br /> <br />ESTIMATED CONSTRUCTION COSTS <br /> <br />Owners in this reach are the Pinehurst Country Club and Ft. Logan <br />National Cemetery. Since there is no plan for future development <br />within the lOa-year floodplain, in the Pinehurst Country Club, no major <br />improvement was recommended except the installation of buried riprap at <br />the lake in Pinehurst Country Club. <br /> <br />Item <br /> <br />Cost <br /> <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />Buried Riprap $ <br />3 - g6-inch x 48-inch Concrete Box Culvert Bridge - 160 feet <br />Relocate 4- inch gas - 60 ft. <br />Relocate 10-inch gas - 60 ft. <br /> <br />The existing culvert at Sheridan Boulevard can only carry approxima- <br />tely 200-cubic feet per second (an equivalent of a 2-year storm). A <br />concrete box culvert bridge would be constructed to avoid the storm <br />runoff overtopping the roadway. The bridge has been sized to pass <br />laO-year runoff. <br /> <br />Total Construction Costs $ <br /> <br />Engineering and Contingencies (35% of Construction Costs) $ <br />Fiscal, Legal and Administrative (5% of Construction Costs) <br />Land Acquisition Costs <br /> <br />Total Costs <br /> <br />The developments in the Ft. Logan National Cemetery are at planning and <br />design stage, no major improvement was recommended in this report. <br />However, a close coordination with Ft. Logan National Cemetery should <br />be held in final design. <br /> <br />Annual Maintenance Cost <br /> <br />It is recommended that the laO-year floodplain should be delineated <br />and regulated and the Pinehurst Country Club and the Ft. Logan <br />National Cemetery be notified annually of the potential flood hazards. <br /> <br />15,600 <br />165,300 <br /> <br />4,200 <br />5,400 <br />190,500 <br /> <br />$ <br /> <br />66,700 <br />9,500 <br />o <br />266,700 <br /> <br />$ <br /> <br />100 <br />
The URL can be used to link to this page
Your browser does not support the video tag.