My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD09313
CWCB
>
Floodplain Documents
>
Backfile
>
8001-9000
>
FLOOD09313
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 10:08:49 AM
Creation date
10/5/2006 4:11:19 AM
Metadata
Fields
Template:
Floodplain Documents
County
Denver
Community
Denver
Stream Name
Marston Lake North
Basin
South Platte
Title
Major Drainageway Planning
Date
10/1/1979
Prepared For
Denver
Prepared By
UDFCD
Contract/PO #
&&
Floodplain - Doc Type
Floodplain Report/Masterplan
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Most of the areas in this reach are the property of the Pinehurst <br />Country Club. Because there is no plan for future development within <br />the 100-year floodplain, no major improvement was recommended except <br />the installation of buried riprap at the embankments of two lakes. <br />Since major storms would overtop the embankments of the lakes, buried <br />riprap would control erosion and reinforce the embankments. <br /> <br />Item <br /> <br />Cost <br /> <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />Commentary on Sheet 9 <br /> <br />ESTIMATED CONSTRUCTION COSTS <br /> <br />4 - 65-inch x 40-inch <br />Buried Riprap Erosion <br /> <br />CMP - 495 feet $ 112,900 <br />Control 161,000 <br />Total Construction Costs $ 273,900 <br /> <br />Four 65-inch x 40-inch CMP for low flow would be constructed along the <br />north side of Quincy Avenue to convey 5-year storm runoff. Major <br />storms would be ponded at the backwash pond south of Quincy Avenue <br />until the water overtops the roadway. The ponding at the backwash <br />pond will only be temporary because the existing drain pipe would <br />empty the pond after a flooding period. <br /> <br />Engineering and Contingencies (35% of Construction Costs) <br />Fiscal, Legal and Administrative (5% of Construction Costs) <br />Land Acquisition costs - 0.7 acres <br /> <br />Total Costs <br /> <br /> 95,900 <br /> 13,700 <br /> 21 ,000 <br />$ 404,500 <br />$ 600 <br /> <br />Annual Maintenance Cost <br /> <br />It is recommended that the 100-year floodplain is to be regulated and <br />the Pinehurst Country Club be notified annually of the potential flood <br />hazards. <br />
The URL can be used to link to this page
Your browser does not support the video tag.