Laserfiche WebLink
<br />INDEX, Continued. <br /> <br />i. Outlet gate, p. 7 <br />j. Radial gate (Tainter gate), p. 8 <br />k. Regulating gate (regulating valve), p. 8 <br />1. Roller drum gate, p. 8 <br />m. Roller gate (stoney gate), p. 8 <br />n. Skimmer gate, p. 8 <br />o. Slide gate (sluice gate), p. 8 <br />Gate chamber (valve chamber), p. 8 <br />Geotextiles, p' 8 <br />Groin, p. 8 <br />Grout, p. 8 <br />Grout curtain, p. 8 <br />Grout blanket, p. 8 <br />Grout cap, p. 8 <br />Hazard classification, p. 8 <br />Head, Static, p. 8 <br />Head, Velocity, p. 8 <br />Heel, p. 9 <br />Height, Above ground, p. 9 <br />Height, Hydraulic, p. 9 <br />Height, Structural, p. 9 <br />Hydrograph, Breach or Dam Failure, p. 9 <br />Hydrograph, Flood, p. 9 <br />Hydrograph, Unit, p. 9 <br />Hypocenter, p. 9 <br />Instrumentation, p. 9 <br />Intake, p. 9 <br />Inundation map, p. 9 <br />Length of dam, p. 9 <br />Liquefaction, p. 9 <br />Logboom, p. 9 <br />Maximum flood control level, p. lO <br />Minimum operating level, p. lO . <br />Observation well, p. lO <br />Outlet, p. 10 <br />Outlet Works, p. 10 <br />Parapet wall, p. 10 <br />Penstock, p. lO <br />Phreatic surface, p. 10 <br />Piezometer, p. lO <br />Piping, p. lO <br />Plunge pool, p. lO <br />Probability, p. 10 <br />probable Maximum Precipitation (PMP), p. lO <br />Reservoir, p. lO <br /> <br />-l8- <br /> <br />Reservoir regulation <br />(or operating) procedure, p. 10 <br />Reservoir surface area, p. lO <br />Riprap, p. 10 <br />Risk, p. 11 <br />Risk assessment, p. II <br />Rock anchor, p. 1l <br />Rock bolt, p. II <br />Slope, p. 11 <br />Sluice, p. II <br />Spillway, p. 11 <br />Spillway, Auxillary, p. II <br />Spillway, Primary (or service), p. II <br />Spillway Design Flood (SDF), p. II <br />Spillway channel, p. II <br />Spillway chute, p. II <br />Spillway crest, p. 11 <br />Spillway, Fuse Plug, p. II <br />Spillway, Shaft, p. II <br />Stilling basin, p. l2 <br />Stoplogs, p. 12 <br />Storage, p. l2 <br />a. Dead storage, p. l2 <br />b. Inactive storage, p. l2 <br />c. Active storage, p. l2 <br />d. Live storage, p. l2 <br />e. Reservoir capacity, p. 12 <br />f. Flood surcharge, p. l2 <br />Thrust block, p. 12 <br />Toe of dam, p. 12 <br />Top thickness (top width), p.. l2 <br />Top of dam, p. 12 <br />Trashrack, p. l2 <br />Tunnel, p. 12 <br />Upstream blanket, p. l3 <br />Valve, p. l3 <br />a. Hollow jet valve, p. 13 <br />b. Regulating sleeve valve, p. l3 <br />Volume of dam, p. l3 <br />Watershed divide, p. 13 <br />Wave runup, p. l3 <br />Weir, p. l3 <br />a. Weir, broad-crested, p. 13 <br />b. Weir, measuring, p. l3 <br />c. Weir, ogee, p. l3 <br />Wind setup, p. l3 <br /> <br />llr u.s. Government Printing Offle<l: 1988-!i19-20B <br />