Laserfiche WebLink
<br />EXHIBIT 4 <br /> <br />REQUIRED CROSS SECTIONS FOR NORMAL BRIDGE ROUTINE <br /> <br />The cross sections below show the points required on cards GR when using <br />the normal bridge routine. Cross sections 1, 2, 7, 8 describe the natural <br />river channel. Cross sections} and 6 are adjacent to the bridge on the <br />downstream and upstream sides respectively and include elevations and <br />stations of an artificial levee. whose top is approximately equal to the. <br />low chord elevation (ELLC) and top of roadway elevation (ELTRD) respectively. <br />The artificial levee is included in the cross section points to confine the <br />flow to the channel area (bridge area) when the water flows under the low <br />chord, and to allow the overbank area to be used for flows over the roadway. <br />The left and right bank stations must be equal to the station at the top <br />of the artificial levees. <br /> <br /> <br /> <br />ELLC+ (Section 3) <br />~RD:t (Section 6) <br /> <br /> <br />L/~ ~J <br />I ~ I \ <br /> <br />'U <br /> <br />top <br /> <br />"[''''..'' <br /> <br /> <br /> <br />-0- ..... Low chord <br />points <br /> <br /> <br />+- Ground <br />points <br /> <br />Cross Sections 1, 2, 7, 8 <br />Full natural cross sections <br /> <br />Cross Sections 3 and 6 <br />Immediately downstream <br />and upstream of bridge <br />embankment. <br /> <br />Cross Sections <br />4 and 5 <br />within bridge <br /> <br /> <br />8 <br /> <br />~ <br />Sif- <br /> <br /> <br />o'! <br /> <br />L <br /> <br />I <br /> <br />2 <br />1> <br />I <br /> <br />3 <br /> <br />4 <br /> <br />5 <br /> <br />6 <br /> <br />7 <br />,'0 <br /> <br />Variable IEARA on card X3 must equal 10 for cross <br />sections 4 and 5 are within the bridge and BT (or <br />describe the low chord and top or roadway points. <br />the BT cards should also appear on the GR cards. <br /> <br />sections 3 and 6. <br />X2) cards are used <br />All stations used <br /> <br />Cross <br />to <br />on <br /> <br />. <br />The points defining the artificial levee can be omitted if the elevations <br />where the effective area changes are shown on the X3 cards (eighth and ninth <br />fields). Thus cross sections 3 and 6 could resemble cross sections 2 and 7. <br /> <br />Exhibit 4 <br />