Laserfiche WebLink
<br />7,) - _/(// <br /> <br />. <br /> <br />ATTORNEYS AT LAW <br /> <br /> <br />r~~ " <br />'. "t- <J-,W - <br />,..,., /"""\ .// "'> <br />'-): .(0' 'f) <br />~h / <::? , <br />:;..(-\ \.;...~. <br />/\.. 'J ,- <br />6'.>,~ <br />ji <br />TELE"P'A"ONE (71 9) 471 -1 21 2 <br />TELEFAX (719) 471.1234 <br /> <br /> <br />JAMlES G, flElt, !P.C. <br /> <br />319 NORTH WEBER STREET <br />COLORADO SPRINGS. COLORADO 80903 <br /> <br />JAMES G . FELT <br />CHARLES T. HOUGHTON <br /> <br />June 9, 1992 <br /> <br />Mr. Larry F. Lang, Chief <br />Flood Control and Floodplain Management section <br />Colorado Water Conservation Board <br />1313 Sherman Street, Room 721 <br />Denver, CO 80203 <br /> <br />RE: Flood Plain Designation ~nd Approval <br />City of Cripple Creek <br /> <br />Dear Mr. Lang: <br /> <br />e <br /> <br />In accordance with C.R.S. ~37-60-106(1) (c), the city of <br />Cripple Creek, Colorado, hereby requests designation and approval <br />of storm or floodwater runoff cbannels or basins within the City <br />of Cripple Creek as described in the preliminary report entitled <br />"Floodplain Management Study" prepared for the City of Cripple <br />Creek by the United States Agriculture Soil Conservation Service. <br /> <br />This floodplain study is an ongoing analysis expected to reach <br />its final form in October of this year. All of the preliminary <br />work however has been accomplished and our engineers feel that it <br />is most appropriate as the "best information available" for the <br />City of cripple Creek in its ongoing decisions on floodplain <br />issues. <br /> <br />It is my understanding fro~ my discussions with your staff <br />that you would request that we hire an independent engineering <br />analysis of the floodplain study and make a presentation to you of <br />that analysis. Our City engineers are GMS Inc., and Roger Sams of <br />that firm is very familiar with the proposed Floodplain Management <br />Study being prepared by the Soil Conservation Service. We will <br />conduct such an independent analysis at the City's expense and be <br />prepared to make the presentation to you at your July 9, 1992 <br />Colorado Water Conservation Boara Meeting in Cortez Colorado. <br /> <br />. <br /> <br />As you may be aware, the city of Cripple Creek is undergoing <br />dramatic change as a result of "limited gaming" as approved by the <br />Colorado voter in 1990. Many of the casino construction projects <br />are expected to touch upon and influence the floodplain or <br />floodways within the city of Cripple Creek. It is critical that <br />the City council and its staff have a designated and approved <br />floodplain by your agency as quickly as possible. Hence, we <br />request your timely consideration of this application and are <br />