My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD08977
CWCB
>
Floodplain Documents
>
Backfile
>
8001-9000
>
FLOOD08977
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 10:07:26 AM
Creation date
10/5/2006 4:00:38 AM
Metadata
Fields
Template:
Floodplain Documents
County
Jefferson
Community
Lakewood
Stream Name
Weaver Creek
Basin
South Platte
Title
LOMR - Affected Panel 08059C 0315 E - Case No. 03-08-0596P
Date
3/11/2004
Prepared For
Lakewood
Prepared By
FEMA
Floodplain - Doc Type
Historic FEMA Regulatory Floodplain Information
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />'j <br /> <br />2 <br /> <br />The modifications are effective as of the date shown above. The map panel listed above and as modified <br />by this letter will be used for all flood insurance policies and renewals issued for your communily. <br /> <br />The following table is a partial listing of existing and modified BFEs: <br /> <br />Location <br /> <br />Existing BFE <br />(feet)* <br /> <br />Modified BFE <br />(feet)* <br /> <br />Approximately 1,090 feet downstream of <br />West Hampden Avenue <br />Just downstream of West Hampden Avenue <br /> <br />5,493 <br />5,513 <br /> <br />5,494 <br />5,520 <br /> <br />*Referenced to the Nalional Geodelic Vertical Datum, rounded to the nearest whole foot <br /> <br />Public notification of the proposed modified BFEs will be given in the Lakewood Sentinel on or about <br />December 4 and December II, 2003. A copy of this notificalion is enclosed. In addition, a notice of <br />changes will be published in the Federal Register. Within 90 days of the second publication in the <br />Lakewood Sentinel, any interested party may request that FEMA reconsider the determination made by this <br />LOMR. Any request for reconsideration must be based on scientific or technical data. All interested <br />parties are on notice that, until the 90-day period elapses, the determination to modify the BFEs made by <br />this LOMR may itself be modified. <br /> <br />Because this LOMR will not be printed and distributed to primary users, such as local insurance agents and <br />mortgage lenders, your community will serve as a repository for these new data. We encourage you to <br />disseminate lhe information reflected by this LOMR throughout the community, so that interested persons, <br />such'as'proper1y'owners;-locahnsurance-agents, ana mortgage lenoers, may lienefitfrom the information. <br />We also encourage you to prepare a related article for publicalion in your community's local newspaper. <br />This article should describe the assistance thai officials of your community will give to interested persons <br />by providing these data and intetpreting the NFIP maps. <br /> <br />We will nol physically revise and republish the FIRM and FIS report for your community to reflect the <br />modifications made by this LOMR at this lime. When changes to the previously cited FIRM panel and FIS <br />report warrant physical revision and republication in the future, we will incotporate the modifications made <br />by this LOMR at that time. <br /> <br />This LOMR is based on minimum floodplain management criteria established under the NFIP. Your <br />community is responsible for approving all floodplain development and for ensuring all necessary permits <br />required by Federal or State law have been received. State, county, and community officials, based on <br />knowledge of local condilions and in the interest of safety, may set higher standards for construclion in the <br />SFHA. If the State, counly, or community has adopted more restrictive or comprehensive floodplain <br />management criteria, these criteria take precedence over the minimum NFIP criteria. <br /> <br />The basis of this LOMR is, in whole or in part, a channel-modification/culvert project. NFIP regulations, <br />as cited in Paragraph 60.3(b)(7), require that communities ensure that the flood-carrying capacity within <br />lhe altered or relocated portion of any watercourse is maintained. This provision is incotporated into your <br />community's existing floodplain management regulations. Consequently, lhe ultimate responsibility for <br />maintenance of the modified channel and culvert rests with your community. <br /> <br />This determination has been made pursuant to Section 206 of the Flood Disaster Protection Act of 1973 <br />(Public Law 93-234) and is in accordance with the National Flood Insurance Act of 1968, as amended <br />
The URL can be used to link to this page
Your browser does not support the video tag.