Laserfiche WebLink
<br />------------------- <br /> <br />project TItle <br /> <br />Downtown Conduit Improvements: <br />First Segment (1985) <br />Second Segment (1987) <br /> <br />Off-Channel Storage Facility (1984) <br /> <br />Channel Improvements - <br />Broadway to Clarkson St. (1987) <br /> <br />Channel Improvements - <br />Downtown Englewood (1988) <br />TOTAL <br /> <br />Table 1 <br />Summary 01 Construction Costs <br />Little Dry Creek Flood Contmllmpmvements <br />Englewood, Colorado <br /> <br />MWE. Ltd. Estimate Construction Cost <br /> <br />Contractor <br /> <br />S 804,232 S 725,000 Concrete Works of Colorado <br /> 1,088,800 600,000 Flatiron Structures Co. <br /> 2,026,450 1,700,000 Palisade Construction <br /> 2,853,100 3,000,000 RBI, Ine. <br /> 2.676.800 2.600.000 Lillard & Oark Const. Co. <br />S 9,449,382 S 8,625,000 <br /> <br />, <br />'" <br />. <br />