My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD08905
CWCB
>
Floodplain Documents
>
Backfile
>
8001-9000
>
FLOOD08905
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 10:07:06 AM
Creation date
10/5/2006 3:58:37 AM
Metadata
Fields
Template:
Floodplain Documents
County
Gilpin
Community
Black Hawk
Basin
South Platte
Title
1998 Black Hawk Flood
Date
9/8/1998
Prepared For
Clear Creek County
Prepared By
Consultants
Floodplain - Doc Type
Flood Documentation Report
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
67
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />station access road (Map 3A). This capture of Subbasin B2B flows by the access road <br />stonn sewer reduces street flows in Bobtail Street to approximately 2 cfs and 5 cfs for the <br />5- and 100-year event, respectively. Since the street capacity of Bobtail Street is 2.6 and <br />19 cfs for the 5- and 100-year events, respectively, no additional alternative conveyance <br />facilities are required in the roadway to meet street drainage conveyance standards. <br /> <br />Subbasin B2B discharges onto the western section of Subbasin B2A. It is proposed to <br />direct the access road stonn sewer discharges from Subbasin B2B to an open channel or <br />stonn sewer located on the top of the highwall above the road in Subbasin B2A. Storm <br />peak discharge estimates from the western section of Subbasin B2A equal approximately <br />10 and 25 cfs for the 5- and 100-year event, respectively, calculated by the proportional <br />area method. When Subbasin B2A flows are combined with Subbasin B2B access road <br />flows, the discharges in Subbasin B2A equals approximately 19 and 42 cfs for the 5- and <br />100-year events, respectively. Although it has been suggested to use an open channel to <br />capture flows, it is currently unknown if the highwall provides positive drainage to the <br />proposed culvert. However, if an open channel is to be used, assuming its slope does not <br />exceed 10 percent, the 100-year peak discharge of 42 cfs can be accommodated in a 2.4- <br />foot deep, 3: I side slope triangular channel lined with rough rock. Otherwise, a 24-inch <br />diameter RCP or HDPE pipe, with a minimum slope of 4 percent and inlets located every <br />50-feet along the pipe, should be used to convey flows. Energy dissipation will be <br />required at the outlet of the open channel or the pipe. <br /> <br />Basin B2 flows will be directed to a culvert below Bobtail Street (Map 3A). The culvert <br />will convey discharges to a proposed storm sewer by others discussed in the section on <br />Basin B 1. The design capacity of the culvert equals 53 and 21 cfs, respectively, for the 5- <br />and 100- year events. The invert of the culvert compared to the road elevation and the <br />slope of the culvert are unknown. A 36-inch RCP would require a headwater depth of <br />approximately 4.4 feet above the invert of the pipe to pass 53 cfs. In comparison, a 42- <br />inch RCP would require approximately a headwater approximately 3.85 feet above the <br />invert of the pipe to pass 53 cfs. <br /> <br />It is additionally recommended to place approximately 300-feet of 12-inch diameter <br />slotted drain in the gutter to remove nuisance flows, as shown on Map 3A. <br /> <br />Basin B3 <br /> <br />Under current conditions, Basin B3 point discharges from the location of Bobtail Street <br />over an existing highwall into the parking lot behind Canyon Casino. Stonn peak <br />discharges equal approximately 37 and 94 cfs for the 5- and 100-year event, respectively. <br /> <br />Drainage control for the parking lot (once known as Harrah's Parking Lot) was designed <br />in 1995 (Reference 6). The report (Reference 6) indicated storm peak discharges for the <br />100-year event were approximately 86 cfs, similar to the 94 cfs peak discharge estimated <br />for Basin B3. The 1995 report recommended installing a 36-inch RCP to pass this event <br />through the parking lot. <br /> <br />16 <br />
The URL can be used to link to this page
Your browser does not support the video tag.