Laserfiche WebLink
<br />.. <br />I <br />\1 <br />. <br />. <br />. <br />"I <br />I <br />II <br />I <br />I <br />I <br />I <br />I <br />I <br />,I <br />I <br />I <br />I <br /> <br />EXECUTIVE SUMMARY <br /> <br />The firm of David I. Love & Associates, Inc. (DIL) is under <br />contract with the City of Boulder to assist in establishing a new <br />floodplain/flood way ordinance. In particular, Boulder desires to <br />realistically define high hazard in the vicinity of the floodway in <br />such a way that threats to life and property are minimized. DIL <br />has been retained to study and evaluate various methods of <br />defining unacceptably high hazard within the floodplain. <br /> <br />In order to accomplish this task we have looked at the various <br />definitions of zones within the floodplain, existing floodplain <br />ordinances from numerous cities, literature related to floodplain <br />regulation, and performed scientific and engineering calculations <br />to quantify hazards. In addition, we have interviewed the flood <br />control regulatory experts from the Federal Emergency <br />Management Agency (FEMA) and the Urban Drainage & Flood <br />Control District (UD&FCD) for guidance. <br /> <br />Several definitions of the term "floodway" exist. By way of <br />general definition, it is the area near the channel centerline <br />which conveys the major portion of flood flows. This "higher <br />conveyance" area is characterized by greater depths of flow and <br />high velocities, and is regulated to maintain the flood-carrying <br />capacity of major drainage ways. <br /> <br />A number of cities surveyed regulate major drainageways by the <br />use of a "rise" floodway. A rise floodway is defined in terms of <br />conveyance. This is generally arrived at by modeling the <br />loo-year floodplain as it exists to find the Base Flood Elevation <br />(BFE). The conveyance of the floodplain is then reduced <br />incrementally on either side of the main channel by modeling an <br />encroachment from the boundaries of the floodplain until a <br />predetermined. or "target" rise in the loo-year base flood <br />elevation is reached (Appendix A). FEMA has adopted the one <br />foot rise floodway, as have many municipalities across the <br />country. The UD&FCD has adopted the half foot rise flood way <br />and encourages municipalities within its District 10 do likewise. <br /> <br />A floodplain regulated by a rise defined floodway may not <br />adequately address the hazard to the life safety of individuals <br />caught in rapidly rising flood waters. Boulder has adopted <br />Ordinance 5035 which temporarily suspends the issuance of <br />flood way permits for new habitable structures or for substantial <br />improvements to habitable structures within the half foot rise <br />flood way. This ordinance is intended to be replaced by <br />subsequent regulations which will govern the placement of <br />habitable structures within areas of the floodplain where an <br />unacceptable hazard exists. <br /> <br />- i - <br /> <br />Oevld J. Love & A..ocillt.., Inc. <br />2995 c.ntergrfHHI Court Soulh. Suit. C <br />Boulder. Colorado 8030 1 <br /> <br />-- <br />.- <br /> <br />::- <br /> <br /> <br />""t.~O-___.....~_ <br /> <br /> <br />SUnpHU.d HuMan <br />GeOlUll'J <br /> <br />-..- <br /> <br />...... <br /> <br />Id..llud <br />-Bod}' IIoAoMth- <br /> <br />~ <br /> <br />-- <br />