My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD08868
CWCB
>
Floodplain Documents
>
Backfile
>
8001-9000
>
FLOOD08868
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 10:06:46 AM
Creation date
10/5/2006 3:56:45 AM
Metadata
Fields
Template:
Floodplain Documents
County
Pueblo
Community
Pueblo
Basin
Arkansas
Title
FIS - Pueblo
Date
9/29/1986
Prepared For
Pueblo
Prepared By
FEMA
Floodplain - Doc Type
Current FEMA Regulatory Floodplain Information
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />The following organizations were contacted for additional information <br />during the study: the COE; the U.S. Geological Survey (USGS); the <br />U.S. SOil Conservation Service (SCS); the National Oceanic and <br />Atmospheric Administration (NOAA); the Colorado Department of High- <br />ways; the City of Pueblo; Pueblo County; Sellards and Grigg Consult- <br />ants, Inc.; KLH Engineers; Dames & Moore; and CF&I Steel Corporation. <br /> <br />No intermediate community coordination meeting was held for this <br />draft study. However, a copy of the draft study was provided to <br />community officials for their review. No problems were encountered. <br /> <br />The final community coordination meeting was held on December 18, <br />1984, and attended by representatives of FEMA, the study contractor, <br />and the community. All problems and conCerns raised at that meeting <br />have been addressed in this study. <br /> <br />2.0 AREA STUDIED <br /> <br />2.1 Scope of Study <br /> <br />This Flood Insurance Study covers the incorporated areas of the <br />City of Pueblo, Pueblo County, Colorado. The area of study is <br />shown on the Vicinity Map (Figure 1). <br /> <br />The Arkansas River was studied by detailed methods from upstream <br />of State Highway 227 (downstream of the corporate limits) to a <br />point approximately 1,500 feet downstream of State Highway 96. <br />The remainder of the river upstream of the detailed-study area was <br />studied by approximate methods. The detailed analysis was adopted <br />and revised by the study contractor from the previous COE study <br />(Reference 1). The upstream approximate analysis was adopted by <br />the study contractor from revisions made to the previous COE study <br />(Reference 1) by Dames & Moore. <br /> <br />Fountain Creek was studied by detailed methods from the mouth at <br />the Arkansas River (downstream of the corporate limits) to a point <br />approximately 3,500 feet upstream of State Highway 47. The remainder <br />of the creek upstream of the detailed portion was studied by approxi- <br />mate methods. Both the detailed and approximate analyses were <br />adopted by the study contractor from the previous COE study <br />(Reference 1). Dames & Moore revised the COE analysis for the <br />area from downstream of the Atchison, Topeka & Sante Fe Railway to <br />downstream of U.S. Highway 50. <br /> <br />The detailed analysis for the west bank overflow from Fountain <br />Creek was taken from a report prepared for the City of Pueblo by <br />the study contractor (Reference 2). <br /> <br />Fountain Creek East Bank OVerflow was studied by detailed methods. <br />The detailed analysis was performed by Dames & Moore. <br /> <br />2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.