Laserfiche WebLink
<br />Description <br /> <br />MAJOR DRAINAGEWAY PLANNING <br />SANDERSON GULCH/WEIR GULCH <br /> <br />TABLE OF CONTENTS <br /> <br />Letter of Transmittal <br /> <br />SECTION I <br /> <br />SECTION II <br /> <br />SECTION III <br /> <br />SECTION IV <br /> <br />SECTION V <br /> <br />SECTION VI <br /> <br />INTRODUCTION <br /> <br />Why Study Was Iniated <br />Scope of Work <br />Method of Analysis <br /> <br />STUDY AREA <br /> <br />History of Basins <br />Present State of Development <br />Reservoirs and Irrigation Ditches <br />Parks, Golf Courses, and other <br />Open Lands <br /> <br />HYDROLOGY <br /> <br />General <br />HYDRO Description <br />Design Rainfall <br />Design Points <br />Summary of Hydrological Data <br /> <br />BENEFIT/COST ~N~LYSIS <br /> <br />Theoretical Basis <br />Calculation Methods Used For <br />Damage Potential Analysis <br />Cost Analysis Methods <br />Limitation of Benefit/Cost <br />Analysis <br /> <br />LEGAL <br /> <br />Introd'1ction <br /> <br />SU~~RY OF PHASE A STUDY <br /> <br />Preliminary Meetings and Data <br />Gathering <br />Development of Alternative Plans <br />Alternative Summary <br />Selection Process <br />Recommended Alternatives <br /> <br />i <br /> <br />, <br /> <br />Page No. <br /> <br />1 <br /> <br />i <br />, <br />, <br />I <br />I <br />, <br /> <br />1 <br />2 <br />. <br /> <br />e <br /> <br />8 <br />10 <br />11 <br />18 <br />20 <br />20 <br />21 <br />" <br />27 <br />27 <br />'" <br />58 <br />59 <br />63 <br />63 <br />" <br /> <br />" <br /> <br />67 <br /> <br />67 <br />68 <br />69 <br />" <br />" <br /> <br />SECTION VII <br /> <br />DESIGN CRITERIA <br /> <br />Coordination with Local Entities, <br />Parks Depts., and Other <br />Jurisdictions <br />Special Considerations <br />Tabulated Design Criteria <br />Maintenance Considerations <br /> <br />SECTION VIII MASTER PLAN DRAWINGS <br /> <br />SECTION IX <br /> <br />SECTION X <br /> <br />SECTION XI <br /> <br />Appendix A <br /> <br />General Descriptions of <br />Improvements <br /> <br />ESTIMATED COSTS <br /> <br />Unit Costs <br />Estimated Costs <br />Review of Estimated Costs <br /> <br />SEQUENCE OF IMPLEMENTATION <br /> <br />Sanderson Gulch <br />North Sanderson Gulch <br />Weir Gulch <br />North Weir Gulch <br />South Weir Gulch <br /> <br />SUMMARY AND CONCLUSIONS <br /> <br />Conclu"i<.>nOl <br /> <br />ii <br /> <br />Page No. <br /> <br />80 <br /> <br />80 <br />81 <br />85 <br />91 <br />92 <br /> <br />93 <br /> <br />113 <br />113 <br />114 <br />114 <br />120 <br />120 <br />m <br />m <br />122 <br />123 <br />124 <br /> <br />127 <br /> <br />128 <br />