Laserfiche WebLink
<br />PURGATOIRE (PICKET WIRE) RIVER; COLO. <br /> <br />5 <br /> <br />$909,000 be. appropriated- for construction and none' for ,annual 'maintenance; <br />provided responsible local interests assume the costs of .rights-oC.waYJ, damages <br />due to the Qonstruct~on works, relocations 'or replacements of bridges and'utilities,. <br />alterations to existing bridges, provisions for local drn.junge, relocation of Bacs <br />Diversion, and maintenance of the project after completion of' construction. He <br />further r.ecommends that the first costs of the project be provided in a lump sum in <br />order.to seCure economical and advantageDuB prosecution of the work. <br />, WAR DEPARTMENT, <br />UNITED STATES ENGINEER OFFICE, <br />ALBUQUERQUE DISTRIC'l', <br />Albuquerque, N. Mex., January 15, 191,3. <br />Subject: Survey report on flood control on Purgatoire (Picket Wire) <br />River,Colo,; and Long Canyon, Colo, <br />To: The Chief of Engineers, United States Army (Through the Divi- <br />sion Engineer, Southwestern Division). <br />1. Authority.-This survey report is made in compliance with the <br />provisions of the following authorhlations: <br />'(a) Section 6 of ,the act approved June 22,1936 (Public, No. 738, <br />74th Cong., It R. 8455), wInch reads in part as follows: <br />SEC. 6. The Secretary of War is hereby authorized and directed to cause pre.- <br />liminary examiIlations and surveys for flood control a.t the foIlo",?,ing named <br />localitics, * * *. . <br />Purgatoire (Picket \Vil'c) River, ColorD.do, ,* * *. <br />(b) Section 6 of the act approved June 28, 1938 (Public, No. 761, <br />75th Cong., 3d sess., H. R. 10618), which reads in part as follows: <br />SEC. 6. The Secretary of War is hereby authorized and directed to cause pre- <br />limina.ry examinatiQ'ns and surveys for :flood control, including floods aggravated <br />by or due to tidal effect, at the fol1owing~named localities, * * *. . <br />Long's Canyon, Colorado, lie lie *. <br />A preliminary examination report on Purgatoire (Picket Wire) River, <br />Colo., made under authority of section 6 of the act approved JUne 22, <br />1936, was submitted by the district en!(ineer, Little Rock District, <br />December 16, 1937. The report wllS reVIewed by the BOltrd of Engi, <br />neers for Rivers and Harbors, and a survey of the stream was author- <br />ized by the Ohief of Engineers on February 4, 1938. <br />(c) Authority to omit a separate preliminary examination report on <br />"Long's Canyon, Colo,," correctly identified,as Long Canyon, and to <br />cover both authorities dted above in a single survey' ,report, Wl!S <br />granted by the Chief of Engineers on August 6, 1938. ' ' , <br />2. Prior ,reporI8.-(a) There has, bcen no pnblished report by the <br />War Department for flood control on Purgatoire River or its tribu, <br />taries. The 'stream 'was considered under the subject Irrigation, <br />in the report Arkansas River and Tributaries, published ,as House <br />Document No, 308, Seventy,fourth Congress, first session. At the <br />time of this rerort, it was found that: <br />In the Purgatoire River Basin, no material increase in irrigated area can be <br />made in the upper basin without reservoir development and such development is <br />precluded because of scarcity of reservoir possibilities. * * * Most of the <br />lower basin is in canyon and opportunity for further development of irrigation is <br />very limiteq. It is, therefore, probable tho.t irrigation development in the Purga- <br />toire. River watershed Will be confined to storage of waters in the lower end of the <br />basin for use of lands in the Arkansas River Valley. . <br />(b) In compliance with Public, No. 190, Sevent.y,fourth Congres9 <br />(H. R. 7870), a combined preliminary examination report on flood <br />control of the watershed of both Pur!(atoire and Apishapf1 Rivers in <br />Las Animas County,Colo., was submItted by the Ohief of Engineers; <br />