My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD08833
CWCB
>
Floodplain Documents
>
Backfile
>
8001-9000
>
FLOOD08833
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 10:06:37 AM
Creation date
10/5/2006 3:54:40 AM
Metadata
Fields
Template:
Floodplain Documents
County
Las Animas
Community
Near Trinidad
Stream Name
Purgatoire
Basin
Arkansas
Title
Flood Control Problem Purgatoire near Trinidad
Date
1/1/1944
Floodplain - Doc Type
Project
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
74
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br />. C , <br />o <br />P <br />T <br /> <br />.. <br /> <br />THE ENLARGED SOUTH SIDE DITCH COI1PANY <br /> <br />703 No. Clmmeroial <br />Trinidad, Colorado <br />tlar.oh 2, 19iJ4 <br />"One day nearer Viotoryl tl <br /> <br />Senator Ed. C. Johnson <br />Senate Building <br />Washington, D. C. <br /> <br />Dear Senator Johnsonl <br /> <br />During the 1943 season we were unable to 'produce any orOps on our 6,000 <br />acres due to extremely low flow in the Purgatoire River., Yet, during the <br />twO preceding years, 1941-1942. 335,000 aore feet passed by Trinidad and <br />over our dam, while the normal flow for the two years w:>uld have been <br />142,6000 aore feet. Had some of this ,..,ateI' been oonserved, we oould have <br />had a full orop last season. <br /> <br />We have replaoed our dam that was washed out in t,he 1942 flood, with a per- <br />manent struoture, whioh oost us aboutt15,Ooo. We did this with Purgatoire <br />Soil Conservation Distriot and SoU Conservation Servioe assistanoe. <br /> <br />Under the Flood Control Aots. approved on June 22, 19:;6. and lJune 28, 1938, <br />a preliminary survey of the Purgatoire River was oompleted and submitted <br />to the House of Repre sent ati ves on January 24. 19~. The report emb,odied <br />a.n approved reoonunendation for Flood Proteotion to the City of Trinidad. <br />but made -no provision for flood 0 antrol. It is the opinion of the water <br />users of the Distriot oovered by the report, that the proposed flood pro- <br />teotion for the City of Trinidad does not in any way solve the flood oon- <br />tro1 problEllll and would, if oompleted, result in serious damage to all the <br />irrigated land below, Trinidad. Our headworks. !liS well as those of other <br />Companies. wot\ld be worse off than they now are. <br /> <br />Water oonservation and oontrol is of vital importanee to' the entire OOIllmun- <br />i ty and oonsideration of water oonservation and flood oontrol is urgently, <br />requested for the benefit of all ooncerned. However. all wateh users sin-, <br />oerely think that the money intended for use on a ohannel through Trinidad <br />would not solve the problem as it would make a greater burden on dams and <br />ditohes and oause more ,..,ashouts and damage on theriverb~low Triliidad. <br /> <br />We feel that it would be to the best interests of all ooncerned to have <br />the Bureau of Reolamation interested in the project. Your support in water <br />oonservation on the Pur gatoire River would. we think. solve the problem <br />for the City of Trinidad and land owners on the River. <br /> <br />The vater users are willing to shoulder any of the expense they oan to get <br />this jOb done. This was deoided at a general meeting held February 25. <br />1944. at whioh praotioa11y all oompanies were represented. <br /> <br />Yours very truly, <br /> <br />The Enlarged South Side Ditoh company <br /> <br />(Signed) <br /> <br />BYI James Cummings, President. <br /> <br /> <br />_.-;,,' <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.