Laserfiche WebLink
<br />. ~___-ilI <br />.~ <br /> <br />!&a <br /> <br />GRANADA, COLORADO <br />Condition of Improvement, September 30, 1979 <br /> <br />PROJECT <br />The Granada Local Flood Project was authorized under Section 205 of the <br />Flood Control Act approved June 30, 1948, as amended by the Section 205 Flood <br />Control Act approved October 23, 1962. The project is located on Wolf Creek <br />in Prowers County in Southeastern Colorado. The project consists of channel <br />improvement on Wolf Creek (a right bank tributary of the Arkansas River) to <br />the confluence of the Arkansas River at river mile 1115, and a levee beginning <br />at a high ground point west of town and extending around the west and north <br />sides of town and continuing to a high ground point along Granada Ditch south- <br />east of the Granada sewage treatment plant. <br /> <br />Drainage Area- - - - - - - - - - - - - - - - - - - - - <br />Design Flow - - - - - - - -Outfall Channel - <br />Channel Improvement &: Levee <br /> <br />-122 sq. mi. <br />- - - - -9,200 c,t.s. <br />- - - - 41,000 c,f.s. <br /> <br />Wolf Creek Channel Improvement <br /> <br />Length- - - - - - - - - - - - - - - - - - - - - - - - - - - - - .85 mi. <br />Bottom Width - - - - - - - - - - - - - - - - - - - - - Varies 172-200 ft. <br />Side Slopes - - - - - - - - - - - - - - - - - - - - - - - - - - 1 on 3 <br /> <br />Outfall Channel <br /> <br />Length - - - - - - - - - - - - - - - - - - - - - - - - - - - - -1.41 mi. <br />Bottom Wid~h - - - - - - - - - - - - - - - - - - - - - - - - - -200 ft. <br />Side Slopes - - - - - - - - - - - - - - - - - - - - - - - - - - 1 on 3 <br /> <br />Levees <br /> <br />Length <br />Right Bank Levee-Wolf Creek - - - - - - - - - - - <br />Left Bank Levee-Outfall Channel - - - - - - - <br />Right Bank Levee-Outfall Channel- - - - - - - <br /> <br />- 2.0 mi. <br />- - - 1.48 mi. <br />- - - 1. 36 mi. <br /> <br />Top Width - <br />Slopes- - - <br /> <br />-River side - <br />Land side- - - - - - - <br /> <br />12 ft. <br />----10n3 <br />- - - 1 on 2. 5 <br /> <br />Averap:e Height <br />Right Bank Levee-Wolf Creek - - - - <br />Left Bank Levee-Outfall Channel - - <br />Right Bank Levee-Outfall Channel- <br /> <br />12 ft. <br />7 ft. <br />- 10 ft. <br /> <br />Freeboard <br />Right Bank Levee-Wolf Creek- - - - - - - - - - - - - - - - - - <br />Left Bank Levee-Outfall Channel- - - - - - - - - <br />Right Bank Levee-Outfall Channel - - - - - - - - - - - - - - - <br /> <br />4 ft. <br />None <br />3 ft. <br /> <br />STATUS OF PROJECT <br />Design was completed in FY 78. Costs to September 30, 1979, were <br />$844,427 for new work. <br /> <br />ESTIMATED COST <br /> <br />Federal <br /> <br />-$1,370,000 <br />