Laserfiche WebLink
<br />.- .. <br /> <br />:~":-" <br /> <br />..' . <br />., <br />.;". <br />_...., <br /> <br />r <br />:f,: <br /> <br />~.\! <br />t;.,- <br /> <br />:r. <br /> <br />. <br /> <br />" <br /> <br />T1II~ ACREEHENT, Made and ent"red into this 29th day of June <br />19'19, by and between TIlE ATClIISO;l, TOPEKA A:iD SANTA FE RAIL\,AY CmlPA:;Y, <br />a corporation, (hereinafter called the "Railway COlJpany") and TOI<N <br />OF GRANADA, Prowers County, COlorado, an incorporated town of the <br />State of Colorado (hereinafter called the "Town"). <br /> <br />R E C I TAL S: <br />-------- <br /> <br />Under authority of ,the Flood Control Act of 1948, as amended, <br />approved June 1948 (Public Law 80-858, 80th Congress) the UNITED STATES <br />OF AlffiRICA, represented by the United Stat"s Army Engineer District, <br />Albuquerque, will design and construct a flood control project in <br />the vicinity of Granada, Colorado, and the Town is the, sponsor for <br />the project, <br /> <br />The TOwn, as sponsor, has given assurances to the United <br />States that it will fulfill the requirements of said 1948 Flood Control <br />Act. ~ <br /> <br />The Town will provide, without cost to the United States. <br />all lands, easements and rights-of-way necessary for the construction <br />of the project, and upon completion of the project, the project will <br />become the property of the Town with operation and maintenance responsi- <br />bUi!;ies, <br /> <br />The Railway Company owns land, railroad embankment, tracks, <br />bridges, and other railroad appurtenances along and across Wolf Creek <br />in the Vicinity of Granada, Colorado that will interfere with the <br />construction, operation, and maintenance of the project, <br /> <br />The United States Army, Corps of Engineera, has made a <br />separate agreement with the Railway Company to construct a portion <br />of the project, a flood control channel under Railway Company'. bridge <br />485.8, and a sandbag gap, upon the RaUliay Company'. right-of-way. <br /> <br />Tbe Railway Company and Town agreel <br /> <br />-, ' <br /> <br />ARTICLE I <br /> <br />In consideration of the covenants of the Town hereinafter <br />'contained and of the faithful performance of the same, the Railway <br />Company agrees: <br /> <br />To give and grant a permanent easement to the Town to operate <br />and maintain a flood control chann"l under and through Railway Company's <br />bridge 4SS,Oand a sandbag gap across the Railway Company's tracks <br />and during the crest of extreme flood stages on Wolf Creek at Granada, <br />to permit the placing of a sandbag closure at the closure structure <br />located at approximate railroad station 798+44, (mile 485.8). <br /> <br />, <br /> <br />. . <br />