My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD08723
CWCB
>
Floodplain Documents
>
Backfile
>
8001-9000
>
FLOOD08723
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2010 7:15:23 PM
Creation date
10/5/2006 3:49:33 AM
Metadata
Fields
Template:
Floodplain Documents
County
Larimer
Stream Name
Cache La Poudre
Basin
South Platte
Title
Specifications and Contract Documents for Reservoir Number 2 Rehabilitation Project
Date
7/1/1990
Prepared For
Larimer
Prepared By
Consultants
Floodplain - Doc Type
Community File
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
178
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br /> <br />I <br /> <br />royalty. All variations of the proposed substitute from that <br />specified will be identified in the application and available <br />maintenance, repair and replacement service wjll be indi- <br />cated. The application will also contain an itemized esti- <br />mate of all costs that will result directly or indirectly from <br />acceptance of such substitute. including costs of redesign <br />and claims of other contractors affected by the resulting <br />change, all of which shall be considered by ENGINEER <br />in eva1ualing the proposed subslitate. ENGINEER may <br />require CONTRACTOR to furnish at CONTRACTOR's <br />expense additional data about the proposed substitute. <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />6.7.2. Ifa specific means, method. technique. sequence <br />or procedure of construction is indicated in or required by <br />the Contract Documents. CONTRACTOR may furni~h or <br />utilize a substitute means, method, sequence. technique <br />or procedure of construction acceptable to ENGINEER, <br />if CONTRACTOR submits sufficient information to allow <br />ENGINEER to determine that the substitute proposed is <br />equivalent to that indicated or required by the Contract <br />Documents. The procedure for review by ENGINEER <br />will be similar to that provided in paragraph 6.7.1 as applied <br />by ENGINEER and as may be supplemented in thc Gen- <br />eral Requirements. <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />6.7.3. ENGINEER will be allowed a reasonable time <br />within which to evaluate each proposed substitute. ENGI- <br />NEER will be the sole jodge of acceptability, and no <br />substitute will be ordered. installed or utilized without <br />ENGIN EER's prior written acceptance which will be evi. <br />denced by either a Change Ordcr or an approved Shop <br />Drawing. OWNER may require CONTRACTOR to fur- <br />nish at CONTRACTOR's expense a special performance <br />guarantee or other surety with respect to any substitute. <br />ENGINEER will record time required by ENGINEER <br />and ENGINEER's consultants in evaluating substitutions <br />proposed by CONTRACTOR and in making changes in <br />the Contract Documents occasioned thereby. Whether or <br />not ENGINEER accepts a proposed substitute, CON- <br />TRACTOR shall reimburse OWNER for the charges of <br />ENGINEER and ENGINEER's consultants tor cvaluat- <br />ing each proposed substitute. <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />Concerning Subcontractors, Suppliers and Others: <br /> <br />6.8.1. CONTRACTOR shall not employ any Subcon- <br />tractor, Supplier or other person or organization (including <br />those acceptable to OWNER and ENGINEER as indi- <br />cated in paragraph 6.8.2), whether inilially or as a substi- <br />tute, against whom OWNER or ENGINEER may have <br />reasonable objection. CONTRACTOR shall not be required <br />to employ any Subcontractor. Supplier or olher person or <br />organization to furnish or perform any oflhe Work against <br />whom CONTRACTOR has rcasonable objection. <br /> <br />u.8..2. If the Suprkmcntary Conditions require lhe <br />identity of cerlain Subcontractors, Supplil:rs or uth~r per. <br />sons or organizations (including thos~ who arc to furni"lh <br />the princiflul items of m.Hcri.\ls and equipment) 10 he sub~ <br />mittcJ 10 OWNER in ..Idv.ml.:c llfthl: spl'citiel.l J:'lte prior <br />to the Effective Dale of the Agreement for acceptance by <br /> <br />I <br /> <br />1 <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />OWNER and ENGINEER and if CONTRACTOR has <br />submitted a list thereof in accordance with the Supple- <br />mentary Conditions, OWNER's or ENGINEER's accept- <br />ance (either in writing or by failing to make written objec- <br />tion thereto by the date indicated for acceptance or objec- <br />tion in the bidding documents orthe Contract Documents) <br />of any such Subcontractor, Supplier or other person or <br />organization so identified may be revoked on the basis of <br />reasonable objection after due investigation. in which case <br />CONTRACTOR shall submit an acceptable substitute, the <br />COnlract Price will be increased by the difference in the <br />cost occasioned by such substitution and an appropriate <br />Change Order will be issued or Written Amendment signed. <br />No acceptance by OWN ER or ENGINEER of any such <br />Suhconlractor, Supplier or other person or organization <br />shall constitute a waiver orany right orOWNER or ENOl- <br />N EER to reject dlIee(il'e Work. <br /> <br />6.9. CONTRACTOR shall be fully responsible to OWNER <br />and ENGINEER for all acts and omissions of the Subcon- <br />tractors. SUflpliers and other persons and organizations per- <br />forming or furnishing any of the Work under a direct or <br />indircct contract with CONTRACTOR just as CONTRAC- <br />TOR is rcsponsible for CONTRACTOR's own acts and omis- <br />sions. Nothing in the Contract Documents shall create any <br />contractual relalionship between OWNER or ENGINEER <br />and any such Subcontractor, Supplier or other person or <br />organization, nor shall it create any obligation on the part of <br />OWNER or ENGINEER to payor to see to the payment of <br />any moneys due any such Subcontractor. Supplier or other <br />person or organization except as may otherwise be required <br />by Laws and Regulations. <br /> <br />6.10. The divisions and sections of the Specifications and <br />the identifications of any Drawings shall not control CON. <br />TRACTOR in dividing the Work among Subcontractors or <br />Suppliers or delineating the Work to be performed by any <br />specific trade. <br /> <br />6.11. All Work performed for CONTRACTOR by a Sub- <br />contractor will be pursuunt to an appropriate agreement <br />between CONTRACTOR and the Subcontractor which spe- <br />cifically binds the Subcontractor to the applicable terms and <br />condilions of the Contract Documents for the benefit of <br />OWNER and ENGINEER and contains waiver provisions <br />as required by paragraph 5.11. CONTRACTOR shall pay <br />each Subcontractor a just share of any insurance moneys <br />reccived by CONTRACTOR on account of losses under pol- <br />icies issued pursuant to paragmphs 5.6 and 5,7. <br /> <br />Patent Fees and Royalties: <br /> <br />6.12. CONTRACTOR shall pay alllicensc fees and roy- <br />alties and assume ...11 costs incident to the use in the perfor- <br />mani.:C of the Work or the incorporation in the Work of any <br />inwntion. design. process. product or device which is the <br />'iubjcct or patent rights or copyrights held by others. If a <br />p.trticular invention, desil{n. process. product or device is <br />specified in thl: Cuntracl Documents for use in the perfor- <br />mance of the Work and iflo the actual knowledge orOWNER <br /> <br />15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.