Laserfiche WebLink
<br />. <br /> <br />. <br /> <br />. <br /> <br />Table 16. Damage Summary - 1998 DoHan <br /> <br />Ruehl Dam.~es <br />Damage Category 10-Year 25-Year 50- Y ear l00-Year <br />Reach I <br />Direct Damage $509,500 $2,354,500 $4,875,000 $9,797,000 <br />Other Damage $102,000 $471,000 $975,000 $1,959,000 <br />Total $611,500 $1,825,500 $5,850,000 $10,756,000 <br />ReachD <br />Direct Damage $23,000 $882,000 $1,885,000 $4,899,000 <br />Other Damage $4,500 $176,000 $377,000 $980,000 <br />Total $27,500 $1,058,000 $2,262,000 $5,879,000 <br />Reach or <br />Direct Damage $168,000 $419,000 $670,000 $837,000 <br />Other Damage $34,000 $84,000 $134,000 $167,000 <br />Total $202,000 $503,000 $804,000 $1,004,000 <br />Reach IV <br />Direct Damage $67,500 $135,000 $270,000 $405,000 <br />Other Damage $13,500 $27,000 $54,000 $81,000 <br />Total $81,000 $152,000 $324,000 $486,000 <br /> <br />Proposed improvements will prevent all Pawnee Creek overflows up to the 100-year from entering the <br />City of Sterling. Thus all damage for the lesser flows is prevented for Reaches I and D. With the <br />improvements, floods less than the 25-year flow will follow the historic Pawnee Creek drainageway <br />and will not create an overflow condition. Flows in excess of the 25-year flood will follow the <br />overflow, and will leave residual damage along the farmland. Reach IV includes only the potential <br />damage that results from the lack of capacity under the railroad embankment in this area. (Upstream <br />crop damage would occur with and without the proposed improvements). Even with the proposed <br />railroad culvert in this area, residual damage in the Town of Atwood area would occur. A summary of <br />damage, both before and after the proposed improvemcnts is presented in Table 17. <br /> <br />or-40 <br />