<br />SECTION I <br />EXECUTIVE SUMMARY <br /> <br />. <br /> <br />PU'1)ose of Report <br /> <br />The objective of this project is to develop a Flood Hazard Mitigation Feasibility Study and prepare <br />portions of a final report to assist the City of Sterling and Logan County with the preparation of a full <br />application for the Hazard Mitigation Grant Program (HMGP). The completed application (technical <br />information included) must satisfy all of the FEMA requirements in order for the community to be <br />eligible to receive federal grant money for project implementation. <br /> <br />Authorization <br /> <br />Work on this project was authorized and funded jointly by the Colorado Water Conservation Board, <br />the City of Sterling, and Logan County, Colorado. The study was contracted through the Colorado <br />Water Conservation Board in an agreement dated December 8, 1996, with ICON Engineering, Inc. <br />(ICON). Portions of the work were completed under a separate contract with the Omaha Corps of <br />Engineers. <br /> <br />~ <br /> <br />. <br /> <br />ICON was requested to perform field investigations, technical analyses, report writing, and other tasks <br />necessary to complete selected portions of the desired engineering project. Completion of this project <br />was through a cooperative effort by ICON, the CWCB, the City of Sterling, Logan County, and the <br />Omaha District of the U.S. Army Corps of Engineers. Project assignments and responsibilities were as <br />outlined in the following table. <br /> <br />. <br /> <br />Task . ... .. . . ....... .. ............> Assigned. ................ ................ ......... <br />No. Project Task ..... ... ... .............. ....... . .. ....... ..................... .Respo~sib.ClEntitY. ... <br />1. Base Mapping and Surveys CWCB/Sterling <br />2. Project Coordination and Overall Project Management CWCB <br />3. Problem Description ICON <br />4. Proposed Alternatives Nos. I through 5 ICON <br />5. Proposed Alternative No.6 Corps of Engineers <br />6. Selected Alternative ICON <br />7. Cost Estimate ICON <br />8. Cost Effectiveness ICON <br />9. National Flood Insurance Program Compliance ICON <br />10. Environmental Information ICON <br />II. Work Schedule ICON/City/County <br />12. Authorization ICON <br />13. Final Report ICON <br />14. Technical Addendum ICON <br />IS. Attachments ICON <br />16. Public Meetings CWCB/City/County <br /> <br />Table 1 Project Responsibilities <br /> <br />I-I <br />