Laserfiche WebLink
<br />. <br /> <br />. <br /> <br />. <br /> <br />Table 14. Alternative COlt Summary <br /> <br />Item Alt No. 1 Alt No.2 A1t No.3 Alt No.4 Alt No.5 A1t No.6 <br />Construction None $1,119,878 $20,091,700 $2,012,953 $2,691,000 $2,476,000 <br />Eng.lAdmin None $ 190,379 $ 6,228,427 $ 342,202 $ 458,000 $ 421,000 <br />Land None $ 29,750 $ 1,045,758 $ 65,000 $ 65,000 $ 500,000 <br />Total None $1,340,007. $27,365,885 $2,420,155 $3,214,000 $3,397,000 <br /> <br />Does not include CDOT bridge costs which are budgeted for the year 2001 to replace the structurally <br />and functionally obsolete HWY 6 (Northbound) bridge. Costs are included for increasing the south <br />bound bridge hydraulic capacity as a part of the proposed project. <br /> <br />Non-FEMA Fundinl Sources <br /> <br />Actual projected source of funds or contributions include the following: <br /> <br />Public: <br />Federal Funds: <br />State Funds: <br />City Funds: <br />County Funds: <br /> <br />$1,165,000 <br />$1,100,000. <br />$ 750,000 <br />$ 200,000 <br /> <br />Private: <br /> <br />s <br /> <br />o <br /> <br />TOTAL <br /> <br />$3,215,000 <br /> <br />. Funding from Colorado Water Conservation Board. Of this money, $550,000 has been approved for <br />construction funding with June, 1998 availability. The remainder will be budgeted and given a high <br />priority, pending approval of this HMGP application. <br /> <br />I11-33 <br />