<br />. <br /> <br />. <br /> <br />. <br /> <br />Table 10 <br />Preliminary Cost Estimate <br />Alternative No.3 <br />Detention Dam In Upstream Basin <br /> <br />Item Unit Quantity Unit Cost Cost <br />1. General <br />Mobilization LS 1 $50,000 $50,000 <br />Traffic Control LS 1 $50,000 $50,000 <br />2. Dams (Embankment Fill) <br />P-1 CY 796,307 $3 $2.388,921 <br />P-2 CY 248,481 $3 $745.443 <br />P-3 CY 694.901 $3 $2,084,703 <br />P-4 CY 1,112,804 $3 $3.338.412 <br />P-5 CY 694.640 $3 $2,083,920 <br />P-6 CY 680,517 $3 $2,041,551 <br />P-7 CY 674083 $3 $2,022,249 <br /> <br />Subtotal <br />15% Contingency <br />Update to 1998 Dollars <br />Subtotal Construction Cost <br /> <br />$14,805,199 <br />$2,220,780 <br />$3,064.676 <br />$20,090,655 <br /> <br />Engineering Costs (12%) <br />Legal, Fiscal & Administration (5%) <br />Land Acquisition (flow easement) <br /> <br />$2,410,879 <br />$1,004,533 <br />2940 $1,470,000 <br /> <br />AC <br /> <br />$500 <br /> <br />Total Project Cost <br /> <br />$24,976,066 <br />