Laserfiche WebLink
<br />Oc ~ I ( Ot, ~ 1< Q. <br />I I <br />I I I <br />I II II II Ill-. f /1 II II II I II I I I II I II <br /> <br />"I.n <br /> - r---.... <br /> ....... '-..... <br />'-0.95 "" <br /> - i-- " <br /> r----.. ........ '\. <br />,'0,90 ~ \ <br />"O,~5 - - "" l\ <br /> r- <br />1 ........... ~ <br />..0.80 -0 <br /> <br />" II " II , ' <br />e = (1- ~: ) <br /> <br />e =(1-~) <br />Oc <br /> <br />0,20 <br /> <br />0,16 <br /> <br />0,12 <br /> <br />.. <br />:.c <br /><3 <br /> <br />0,08 <br /> <br />0.04 <br /> <br />o <br />0,2 <br /> <br />0,3 <br /> <br />0.4 <br /> <br />0.5 <br /> <br />"-J111'"'IIIIII"11 <br /> <br />where Oc < 0. or <br /> <br />where 0. < Oc <br /> <br />0,6 <br /> <br />1.0 <br /> <br />0,7 <br /> <br />0,8 <br /> <br />0,9 <br /> <br />Figure 8.-Incremental backwater coefficient for eccentricity. <br /> <br />M <br /> <br />piers with the direction of flood flow, The ratio of <br />the water area occupied by piers, A., to the gross <br />water area of the constriction, .1." both based on <br />the normal water surface, has been assigned the <br />letter J. In computing the gross water area, A." the <br />presence of piers in the constriction is ignored. The <br />incremental backwater coefficient for the more <br />common types of piers and pile bents can be ob- <br />tained from figure 7, By entering chart A with the <br />proper value of J and reading upward to the proper <br />pier type, !!.K is read from the ordinate. Obtain the <br />correction factor, cr, from chart B for opening ratios <br /> <br />other than unity. The incremental backwater co- <br />efficient is then: <br /> <br />!!.Kp = cr!!.K <br /> <br />The incremental backwater coefficient8 for pile <br />bents can, for all practical purposes, be considered <br />independent of diameter, width, or spacing of piles <br />but should be increBred if there are more than 5 <br />piles in a bent. A bent with 10 piles should be given <br />a value of !!.Kp about 20 percent higher than that <br />shown for bents with 5 piles, If there is a possibility <br />of trash collecting on the piers, or piles, it is ad- <br /> <br />16 <br />