Laserfiche WebLink
<br />f <br /> <br />( <br />. <br /> <br />2 <br /> <br />Location <br /> <br />Existing BFE Modified BFE <br />(feet)* (feet)* <br /> <br />Approximately 700 feet downstream of Fox Street <br />Approximately 575 feet downstream of Fox Street <br />Approximately 200 feet downstream of Fox Street <br />Approximately 700 feet upstream of South Broadway <br /> <br />5,407 <br />5,412 <br />5,413 <br />None <br /> <br />5,410 <br />5,412 <br />5.418 <br />5,458 <br /> <br />*Referenced to the National Geodetic Vertical Datum, rounded to the nearest whole foot <br /> <br />Under the above-mentioned Acts of 1968 and 1973, the Mitigation Directorate must develop <br /> <br />criteria for floodplain management. For the community to participate in the National Flood Insurance <br /> <br />Program (NFIP), the community must use the modified BFEs to administer the floodplain management <br /> <br />measures of the NFIP. These modified BFEs will also be used to calculate the appropriate flood <br /> <br />insurance premium rates for new buildings and their contents and for the second layer of insurance on <br /> <br />existing buildings and contents. <br /> <br />Upon the second publication of notice of these changes in this newspaper, any person has 90 days <br /> <br />in which he or she can request, through the Chief Executive Officer of the community, that the Mitigation <br /> <br />Directorate reconsider the determination. Any request for reconsideration must be based on knowledge <br /> <br />of changed conditions or new scientific or technical data. All interested parties are on notice that until <br /> <br />the 90-day period elapses, the Mitigation Directorate's determination to modify the BFEs may itself be <br /> <br />changed. <br /> <br />Any person having knowledge or wishing to comment on these changes should immediately notify: <br /> <br />The Honorable Dennis Reynolds <br />Mayor, City of Littleton <br />2255 West Berry Avenue <br />Littleton, Colorado 80165 <br />