My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD08639
CWCB
>
Floodplain Documents
>
Backfile
>
8001-9000
>
FLOOD08639
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2010 7:15:09 PM
Creation date
10/5/2006 3:46:33 AM
Metadata
Fields
Template:
Floodplain Documents
County
Statewide
Community
State of Colorado
Stream Name
All
Basin
Statewide
Title
Statewide River Rehabilitation and Floodplain Management Needs Inventory
Date
2/18/1998
Prepared For
CWCB
Prepared By
McLaughlin Water Engineers, Ltd.
Floodplain - Doc Type
Educational/Technical/Reference Information
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
90
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Based on recommendations from CWCB staff and the Ste,ering Conunittee, a second questionnaire was <br />developed for distribution to special dis':ricts, environmental organizations and other water related groups, <br />Complete copies of the original questionnaires sent to Colorado communities and organizations may be <br />found in Appendix C, with I:opies of the original mailing lists, <br /> <br />Distribution <br />On October 23, 1997, the questionnai:es were mailed to 63 counties and 268 cities and towns, with a <br />request that they be returned by Novenber 14, 1997, Similarly, questionnaires were distributed to 110 <br />water related organizations, <br /> <br />Rate of Return <br />By the initial November 14 deadline, only JO percent of the communities had responded. In order to <br />improve the response rate, members of the consultant team made over 200 follow-up phone, calls to the <br />non-responding communities. This effort dramatically improved the return rate. By the end of January, <br />approximately forty-four percent (44.4%) of Colorado counties had returned their questiOlmaires, and <br />approximately (39,9%) of cities and towns had responded, Overall, 135 of the 331 questiormaires (40,8 %) <br />have been received, Twenty-four of the I JO organizations (21.8%) also completed questionnaires, <br /> <br />Questionnaire Review <br />Each questionnaire was reviewed by MWE staff. Completed questionnaires ranged from very brief <br />responses with minimal or incomplete clata to extensive documents with detailed responses that included <br />maps, reports, or other supplemental information. Additional follow--up calls were made to fill in blanks <br />on returned questionnaires or to clarity responses, Once all information was verified, the questiormaires <br />were entered into a database model, as discussed in the next chapter. <br /> <br />I1-3 <br /> <br />97-060,001 <br />
The URL can be used to link to this page
Your browser does not support the video tag.