Laserfiche WebLink
<br />, <br /> <br />POLICY DISCUSSION (Division "A") <br /> <br />A. What role does the Board want to play in regard to flood <br />plain management? <br /> <br />1. Develop minimum regulations to be furnished to local <br />entities for adoption, administration, and enforcement? <br /> <br />2. Establish uniform flood plain regulations for the state, <br />to be administered by the state through local entities <br />(similar to the model subdivision regulations published <br />by the Colorado Land Use Commission)? <br /> <br />3. Give only guidance and technical assistance to local <br />entities in establishing their flood plain management <br />regulations? <br /> <br />4. None, unless there are state monies involved? <br /> <br />B. What is the Board's policy as to the portion of the lOO-year <br />flood plain to be regulated? <br /> <br />1. Regulations would allow no building within the selected <br />flood plain? <br /> <br />2. Regulations would establish a floodway with no develop- <br />ment and limit development in the flood fringe until <br />significant fringe development has taken place to sub- <br />stantially increase the flood stage (I-foot rise in <br />flood stage)? <br /> <br />3. Regulation:> would establish a floodway with no develop- <br />ment and a flood fringe with total development? The . <br />size of the floodway would be established as that area <br />required to pass the de:>ignated flood without signifi- <br />cantly raising the flood stage (1 foot), assuming the <br />flood fringe were completely developed and could not <br />contribute to flood flow of overbank storage? <br />