Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br /> PRELIMINARY COST ESTIMATE FOR LEVEE IMPROVEMENTS * <br /> ITEM QUANTITY UNIT UNIT COST EXTENSION <br />1. LEVEE EMBANKMENT 11,000 C.Y $ 3.00 $33,000.00 <br />2. CONCRETE RETAINING WALL 28 C.Y. 250.00 7,000.00 <br />3. SALT TREATED FIR STOP LOGS 252 L.F. 6.00 1,512.00 <br /> (2" X 12") <br />4. STREET CONSTRUCTION <br /> a) EMBANKMENT 1,400 C.Y. 5.00 7,000.00 <br /> b) PAVEMENT REMOVAL AND <br /> REPLACEMENT 2,500 S.Y. 12.00 30,000.00 <br /> $78,512.00 <br /> 15% CONTINGENCY 11,488.00 <br /> $90,000.00 <br /> <br />* THESE COSTS SHOULD BE CONSIDERED AS PRELIMINARY SUBJECT TO CHANGE DURING <br />FINAL DESIGN PHASE. <br /> <br />-25- <br />