Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />. <br />I <br />. <br />. <br />. <br />. <br />I <br />I <br />I <br />I <br />I <br />'. <br />I <br />I <br />. <br /> <br />CHAPTER III <br />HYDROLOGY AND HYDRAULIC ANALYSIS <br /> <br />A. HYDROLOGY ANALYSIS <br />The hydrologic values and computations for the Rito Seco were obtained from <br />the USDA SCS close-out report. Discharges for the North Basin (4.5 sq. mi.) <br />were as follows: <br /> <br />Frequency Flood Di scharge (cfs) <br />10 year 118 <br />50 yea r 168 <br />100 year 189 <br />500 year 245 <br /> <br />For the East Drainage Basin (38.0 sq. mi.) the 100 year flood discharge used <br />was 680 cfs. <br /> <br />WRC estimated the 100 year flood discharge of Culebra Creek at its confluence <br />with the Rito Seco from a regional analysis of similar stream basins. The 100 <br />year flood discharge was computed to be 1200 cfs. Background information and <br />data are presented in the Technical Addendum. <br /> <br />B. HYDRAULIC ANALYSIS <br />The 100 year water surface profil es and fl oodpl ai n for Cul ebra Creek, Rito <br />Seco east of the levee, and Rito Seco through the Town were estimated using <br />the U. S. Army Corps of Engineers HEC-2 Water Surface Profiles computer <br />program. <br /> <br />For both Culebra Creek and Rito Seco east of the levee, cross sections were <br />taken by field surveying. Cross section from the SCS closeout report as well <br />as selected ground shot sections were used for the Rito Seco through Town. <br /> <br />Computer output and a diskette are located in the Technical Addendum. <br /> <br />-11- <br />