My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD08612
CWCB
>
Floodplain Documents
>
Backfile
>
8001-9000
>
FLOOD08612
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2010 7:15:04 PM
Creation date
10/5/2006 3:45:47 AM
Metadata
Fields
Template:
Floodplain Documents
County
Gilpin
Community
Black Hawk
Stream Name
North Clear Creek
Basin
South Platte
Title
LOMR - Affected Panel 080076 0001 B - Case No. 01-08-251P
Date
3/1/2002
Prepared For
Black Hawk
Prepared By
FEMA
Floodplain - Doc Type
Historic FEMA Regulatory Floodplain Information
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />2 <br /> <br />The following table is a partial listing of existing and modified BFEs: <br /> <br />Location <br /> <br />Existing BFE <br />(feet)' <br /> <br />Modified BFE <br />(feet)' <br /> <br />Approximately 800 feet downstream of <br />former Main Street bridge <br />Approximately 900 feet downstream of <br />former Main Street bridge <br />Approximately 530 feet upstream of <br />former Main Street bridge <br /> <br />7,942 <br /> <br />7,940 <br /> <br />7,936 <br /> <br />7,937 <br />7,976 <br /> <br />7,975 <br /> <br />'Referenced to the National Geodetic Vertical Datum, rounded to the nearest whole foot <br /> <br />Public notification of the proposed modified BFEs will be given in the Weekly Register Call on or about <br />March 15 and March 22, 2002. A copy of this notification is enclosed. In addition, a notice of changes <br />will be published in the Federal Register. Within 90 days of the second publication in the Weekly <br />Register Call, any interested party may request that FEMA reconsider the determination made by this <br />LOMR. Any request for reconsideration must be based on scientific or technical data. All interested <br />parties are on notice that, until the 90-day period elapses, the determination to modify the BFEs made by <br />this LOMR may itself be modified. <br /> <br />Because this LOMR will not be printed and distributed to primary users, such as local insurance agents <br />and mortgage lenders, your community will serve as a repository for these new data. We encourage you <br />to disseminate the information reflected by this LOMR throughout the community, so that interested <br />persons, such as property owners, local insurance agents, and mortgage lenders, may benefit from the <br />information. We also encourage you to prepare a related article for publication in your community's local <br />newspaper. This article should describe the assistance that officials of your community will give to <br />interested persons by providing these data and interpreting the NFIP maps, <br /> <br />We will not physically revise and republish the FIRM and FIS report for your community to reflect the <br />modifications made by this LOMR at this time. When changes to the previously cited FIRM panel and <br />FIS report warrant physical revision and republication in the future, we will incorporate the modifications <br />made by this LOMR at that time, <br /> <br />This LOMR is based on minimum floodplain management criteria established under the NFIP, Your <br />community is responsible for approving all floodplain development and for ensuring all necessary permits <br />required by Federal or State law have been received. State, county, and community officials, based on <br />knowledge of local conditions and in the interest of safety, may set higher standards for construction in <br />the SFHA, If the State, county, or community has adopted more restrictive or comprehensive floodplain <br />management criteria, these criteria take precedence over the minimum NFIP criteria. <br /> <br />The basis of this LOMR is, in whole or in part, a channel-modification project, NFIP regulations, as cited <br />in Paragraph 60.3(b )(7), require that communities ensure that the flood-carrying capacity within the <br />altered or relocated portion of any watercourse is maintained, This provision is incorporated into your <br />community's existing floodplain management regulations. Consequently, the ultimate responsibility for <br />maintenance of the modified channel rests with your community, <br /> <br />This determination has been made pursuant to Section 206 of the Flood Disaster Protection Act of 1973 <br />(Public Law 93-234) and is in accordance with the National Flood Insurance Act of 1968, as amended <br />(Title XIII of the Housing and Urban Development Act of 1968, Public Law 90-448), 42 U.S.C. <br />4001-4128, and 44 CFR Part 65. Pursuant to Section 1361 of the National Flood Insurance Act of 1968, <br />
The URL can be used to link to this page
Your browser does not support the video tag.