My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD08598
CWCB
>
Floodplain Documents
>
Backfile
>
8001-9000
>
FLOOD08598
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2010 7:15:02 PM
Creation date
10/5/2006 3:45:31 AM
Metadata
Fields
Template:
Floodplain Documents
County
Conejos
Community
San Luis Valley
Basin
Rio Grande
Title
Subsurface Drainage Feasibilty Study Guadalupe
Date
9/1/1996
Prepared For
Conejos County
Prepared By
CWCB
Floodplain - Doc Type
Floodplain Report/Masterplan
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />II <br /> <br />! <br /> <br />I <br />I <br />il <br />I <br />II <br />I <br />I <br />I <br />II <br />I <br />.1 <br />I <br />I <br />I <br />I <br /> <br />STATE OF COLORADO <br /> <br />Colorado Water Conservation Board <br />Department of Natural Resources <br /> <br />721 SlAte Centennial Building <br />1313 Sherman Street <br />Denver. Co1otado 80203 <br />Phone (303) 866-3441 <br />FAX (303) 866-4474 <br /> <br />o <br /> <br />Roy Romer <br />Governor <br /> <br />James S. Lochhead <br />Execmive Director, DNR <br /> <br />October 13, 1995 <br /> <br />Dories C. Lile. P.E. <br />Directot. CWCB <br /> <br />Mr. Rich Muniz <br />Development Resources Group <br />P.O. Box 300 <br />Alamosa, CO 81101 <br /> <br />Dear Rich: <br /> <br />As a follow-up to my previous discussions regarding the Town of Guadalupe's flooding <br />problems, I am confirming our meeting for October 25, 1995 at 3:00 p.m. I would like to meet <br />you at the Conejos County Offices then proceed to Guadalupe. The purpose of the meeting is <br />to scope the "Work Plan" for the performance of a flood mitigation projec1 which will mitigate <br />flood problems in the community. <br /> <br />As I previously requested, we need a backhoe and operator in order to excavate a test hole <br />to determine subsurface flow rates. Permission from the landowner for this activity is also a <br />prerequisite. <br /> <br />Mr. Tom Browning on my staff will be the project engineer for the performance of this <br />project. I look forward to working with the Town on this flood mitigation project with the goal <br />of the formulation of flood measures which will reduce future flood losses and problems. <br /> <br />LLI <br /> <br />Sincl~' L <br />'/~~. r 1 ~7 <br />lLarry Fang, Cliief ! <br />Flood ontrol and Floodplain Management Section <br /> <br />b: gu.adproj.ltr <br />
The URL can be used to link to this page
Your browser does not support the video tag.