Laserfiche WebLink
<br /> <br />:I> h <br /> <br />Community Contact: <br />Date: <br />Community <br />Name: <br />Title: <br />Organization: <br />Phone Number: <br />Contact by: <br /> <br />CWCB FLOODPLAIN STUDY REVIEW <br />Community Contact Documentation <br /> <br />Res. No. a>-S3LJ. <br /> <br />II /2.9/00 <br />SA'-<.lP'T <br />(Y)U<:E KII'1~A4.' <br />MA~o,. <br />TOWN t>F .<.Awf"T <br />('110) 72.8-3'70R <br />~22"G'R"'~ <br /> <br />Time: <br /> <br />8:Cl)Pm <br /> <br />Discussion Items: <br />· Provide information on the floodplain designation process. ),oe:~ NOT I<"'ow <br />)!l Notification letters were sent out by CWCB. Was the letter received? 0 Yes 0 No <br />)lj( Montgomery Watson is contracted to CWCB to provide technical reviews of studies. <br />)iii CWCB is considering designation of the streams in the study at its next board meeting on <br />f..bl/. 2.0 <br />)if Community must respond with a letter requesting designation within 30 days of next <br />CWCB Board meeting. A sample was sent with the notification letter. Has the <br />community responded to CWCB with a letter? 0 Yes )lif No <br />}ll' Tom Browning with CWCB will be in contact to coordinate a floodplain informational <br />meeting with the community. He can be contacted for further information at (303) 866- <br />3441. <br /> <br />· Provide information on regulatory issues. <br />~ CWCB is required to assist in the prevention of floods and flood damages therefrom <br />)4 Legislative bodies of local jurisdictions may provide zoning regulations for land uses on <br />or along any storm or floodwater runoff channel or basin only after designation and <br />approval of the study by the CWCB. <br />pi CWCB has been directed to designate and approve storm or floodwater runoff channel or <br />basins and to make such designations lIvailable to legislative bodies of local jurisdictions. <br /> <br />· Solicit community input on the floodplain study to be reviewed including any known <br />floodplain mapping inaccuracies or other technical problems with the study. <br />)'1 Has there been significant development within the community since the floodplain maps <br />were issued? <br />lit Have other structures been constructed since the floodplain maps were issued? <br />)If Have flood protection measures been implemented since the floodplain maps were issued <br />(dikes, reservoirs, operational policies)? <br /> <br />· Collect flood history and other information that would be helpful or pertinent to evaluating <br />the communities floodplain information. <br />'fl Have there been any significant historical floods? Is any documentation available. <br />Jll Have there been any recent floods? Are photographs or mapping available? <br />if Are there locations where flooding occurs regularly. <br /> <br />Page 1 <br />