Laserfiche WebLink
<br />I <br />, <br /> <br />Table 5 (continued) <br />WORK ELEMENTS AND TASKS <br /> <br />WORK ELEMENT G. DETERMINE POTENTIAL ADVERSE EFFECTS OF GRAVEL <br />MINING OPERATIONS AND DEVELOP ALTERNATIVE METHODS <br />OF PREVENTING ADVERSE EFFECTS IN THE CACHE LA <br />POUDRE FLOOD PLAIN BETWEEN LAPORTE AND GREELEY <br /> <br />TASKS : <br /> <br />G..,1. <br />G..,2. <br /> <br />r <br />i1E: <br />~: <br /> <br />G..,3. <br />G-:4. <br />G..,5. <br />G..,6. <br />G..,7. <br />G.,.8. <br />G79. <br /> <br />Define current gravel mining practices <br />Develop conveyance data for ultimate flood plain <br />conditions if current practices continue <br />Determine resulting discharges and stages <br />Evaluate flood-related impacts <br />Develop alternative mining regulations <br />Develop conveyance data for each alternative <br />Determine resulting discharges and stages <br />Prepare displays <br />Prepare report <br /> <br />WORK ELEMENT H. DETERMINE ALTERNATIVE HYDRAULIC DESIGN CONCEPTS <br />FOR BRIDGE REPLACEMENT ALONG THE CACHE LA POUDRE <br />RIVER THAT WOULD ASSURE THAT LOCAL FLOOD CONDITIONS <br />WOULD EITHER REMAIN UNCHANGED OR BE REDUCED IF THE <br />BRIDGES WERE REPLACED. <br /> <br />TASKS: H-1. <br /> <br />H-2. <br /> <br />H_3. <br /> <br />H,..4. <br />H~5. <br /> <br />,\ <br />:/ ' WORK ELEMENT I. <br /> <br />TASKS : <br /> <br />I,..1. <br />I,..2. <br />I.,.3. <br />I,..4. <br />I-5. <br /> <br />Determine required bridge opening(s) with road <br />raised above 100-year flood <br />Determine required road-weir elevation and <br />length for 50-year bridge design <br />Determine required road-weir elevation and <br />length for 10-year culvert design <br />Prepare displays <br />Prepare report <br /> <br />IDENTIFY AND EVALUATE FLOOD PLAIN MANAGEMENT <br />ALTERNATIVES ON BOXELDER CREEK BETWEEN HIGHWAY <br />14 AND PROSPECT STREET AND ALONG THE CACHE LA <br />POUDRE RIVER AT LAPORTE, FORT COLLINS. AND GREELEY. <br /> <br />Flood plain land use inventory <br />Encode land use data <br />Debug land use data <br />Determine management alternatives (3) <br />Develop associated land use <br /> <br />29 <br />