Laserfiche WebLink
<br />WORK ELEMENTS AND TASKS <br /> <br />t <br />iir <br />~. <br />~:;. . <br /> <br />The work elements and tasks described in this section are <br />designed to provide information that satisfies the identified <br />flood related information needs. There are 11 major work elements. <br />Each work element includes from 2 to 17 specific tasks. Table 5 <br />includes a brief description of each work element and task. <br /> <br />COST ESTIMATE <br /> <br />Total cost of the study is estimated to be $204,000. Cost <br />estimates for each work item are shown in table 6. A cost <br />schedule is sh~ in table 7. <br /> <br />SCHEDULE <br /> <br />The study is sCheduled for completion in October 1978. A <br />schedule for COmpleting each of the. work elements is shown in <br />figure 2. <br /> <br />26 <br />