My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD08558
CWCB
>
Floodplain Documents
>
Backfile
>
8001-9000
>
FLOOD08558
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2010 7:14:54 PM
Creation date
10/5/2006 3:44:03 AM
Metadata
Fields
Template:
Floodplain Documents
County
Eagle
Community
Gypsum
Stream Name
Eagle River
Basin
Colorado Mainstem
Title
Hydrology Addendum FIS - Town of Gypsum, Eagle County
Date
10/1/2002
Prepared For
CWCB
Prepared By
Montgomery Watson Harza
Floodplain - Doc Type
Floodplain Report/Masterplan
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br />. <br />. <br />. <br />. <br />'. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />. <br />I. <br />I. <br />. <br />. <br />. <br />. <br />. <br />'. <br />. <br />. <br />. <br />'. <br />. <br />. <br />. <br />,. <br />. <br />. <br />I. <br />. <br />. <br />'. <br />. <br />. <br />. <br />. <br /> <br />Floodin!!: Problems and Floodin!!: History <br />Flooding along the Eagle River and Gypsum Creek, in Gypsum, usually occurs from May <br />through September. Floodwaters can occur from snowmelt, intense rainstorms and cloudbursts, <br />or rainstorms augmented by snowmelt. <br /> <br />Past floods in Gypsum, on both the Eagle River and Gypsum Creek, occurred in August and <br />September 1963 and in June 1965, Both of these floods caused minor damage. There are no <br />recorded discharges available for these floods. <br /> <br />(Note: Information from 1983 Flood Insurance Study) <br /> <br />Previous Studies <br />A Flood Insurance Study was conducted for the Town of Gypsum, Eagle County, Colorado and <br />is dated March 16, 1983, A LOMR was issued on October 5, 1999 which changed some of the <br />profile information in the FIS for Eagle River. <br /> <br />Two other studies on the Eagle River have been researched, The first is a floodplain study done <br />by J. F. Sato and Associates with a revision date of June 23, 1999. It is anticipated that these <br />drawings are the precursor to the already approved LOMR. The second is two maps of a plan <br />view of Gypsum Creek marked "preliminary" and dated November 3, 2000. In the comer is a <br />note that reads "This map has not been approved by the Federal Emergency Manag[e]ment <br />Agency (FEMA) and may be revised based on the FEMA review." It is not consistent with the <br />FIS information provided 17 years earlier. <br /> <br />Community Response to the CWCB Desi!!:nation and Approval Process <br />A letter from the CWCB was transmitted to the Town of Gypsum regarding the Board's <br />proposed action for designation and approval of the Town's FIRMs. CWCB has not yet received <br />a letter back from the Town requesting designation. Jeff Shroll, the manager of the Town of <br />Gypsum, does not anticipate the community responding, either negatively or positively. <br /> <br />6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.