Laserfiche WebLink
<br />. <br />, <br /> <br />..., <br /> <br />. <br /> <br />APPLICATION 01' THE lIBC-2 SPLIT !'LOW OPTION <br /> <br />IN'1'RODUC'1'ION <br /> <br />Purpose and Scope. <br /> <br /> <br />The purpose 'Of this training ~Ulllent f s to provide infarNtion on the <br /> <br />caoabilities an~ limitati'Ons of tbe computer program lIBC-2 Split Plow option. <br /> <br /> <br />This 10cument provi~s a detail'" ~escription of the input requiroents, output <br /> <br /> <br />results, co~tational met~s and example applications for the split flow <br /> <br />'Option. <br /> <br />It is assumed that the user has a ~nowledge of the basic HBC-2 input <br /> <br />requirements. Information 'On lIBC-2 input requirements is available in the <br />"lIBC-2 Water Surface Profiles-Users Manual" (reference 1). <br /> <br />Program Doeumentatinn. <br /> <br />The split flow 'Option was added t'O the REC-2 Computer ProgrlUll by <br />Modification 55 which was illlOlelllented April 1982. The orilUlry doewnMtatton far <br />HEC-2 is the Januarv 1981 Users Manual which describes the oroqraa capabilities, <br />input requirements, and nutput. To use the program, one would need a users <br />manual, as this docUlllent does not qive details on manY proqram features and <br />input fnrmats. The users manual is available from the Hydr'Ologic Engineering <br />Center. <br /> <br />\"- <br /> <br />1 <br />