Laserfiche WebLink
<br />COLORADO WATER CONSERVATION BOARD <br />DARlES C ULE, P,E, <br />DIRECTOR <br /> <br />MEMORANDUM <br /> <br />To: <br /> <br />Chuck Lile <br /> <br />From: <br /> <br />Larry Lang <br /> <br />Subject: <br /> <br />Floodplain Designation Plan <br /> <br />Date: <br /> <br />January 4, 1994 <br /> <br />The section staff has completed the inventory, recording, and preparation of a plan for <br />the undesignated floodplain studies. The number of reports has over weldom us. Through <br />Brian's hard work, we have determined that there are 176 undesignated floodplains reports <br />that will require some action by the staff. This backlog has been accumulating over the <br />passed five years; therefore, the numbers aren't to surprising. <br /> <br />I have prepared an executive summary which will provide you with an overview and <br />outline of the plan. We had to make a number of assumptions for the development of the <br />plan, both general and specific. These are: <br /> <br />using 160 man-hours of existing staff time per board meeting for the reviews <br />and preparation of related board materials; <br /> <br />preparing a hydrology handbook to be used for the reviews of the approximate <br />floodplain information which does not have any published discharges; <br /> <br />estimating the man-hours for the performance of the technical reviews by <br />existing staff or a consultant; and <br /> <br />allotting the 176 reports into management work groups. <br /> <br />Presently, the CWCB has deSignated 348 floodplain reports which cover an estimated <br />4,500 stream miles. For a number of these reports, we have only a single copy which is <br />located in Mark's office. The information, as presented in the 348 designated reports and <br />176 undesignated reports, make up the basic data for the board's floodplain informational <br />data system which is being design by Brian. <br /> <br />Two plans are presented for consideration in determining an action plan for the <br />accomplishment of all CWCB designations for the 176 reports. Following your review of <br />the attached plan, I will be happy to discuss the details of the plan with you. <br /> <br />cc: Peter Evans <br />Section Staff <br />. <br /> <br />Im075memo <br /> <br />\./ <br />