My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD08495
CWCB
>
Floodplain Documents
>
Backfile
>
8001-9000
>
FLOOD08495
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/25/2010 7:14:44 PM
Creation date
10/5/2006 3:41:21 AM
Metadata
Fields
Template:
Floodplain Documents
County
Statewide
Community
Statewide
Basin
Statewide
Title
Methodology for Evaluation of Feasibility: Multijurisdictional Urban Drainage and Flood Control Projects
Date
2/1/1977
Prepared By
UDFCD
Floodplain - Doc Type
Educational/Technical/Reference Information
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
66
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />25 <br /> <br />1, Natural type channel (soft channel) <br /> <br /> <br />2. Lined channel (hard channel) <br /> <br /> <br />3. New Condu it <br /> <br />4. No Change <br />Each of the alternatives (except No.4) can be installed for <br /> <br />any design frequency. The lowest cost system for the range of <br />desired design frequencies can be identified by the following <br /> <br />analysis. <br />Soft channel, hard channel or conduit designs increase in cost <br /> <br />with design frequency, The variation in annual cost, including <br /> <br />maintenance, might be as shown in Figure 11-5. <br /> <br />'" <br />o <br /> <br />~ <br />(/) <br />o <br />U <br />.J <br /><( <br />::l <br />Z <br />Z <br /><( <br /> <br />200 <br /> <br />\ <br />\ <br /> <br />"-. ~ <br />"-'.: <br />~. CONDUIT <br />I -:::::::-'-.-HARD <br />I -- - SOFT <br /> <br />400 <br /> <br />..... <br />- <br /> <br />300 <br /> <br />100 <br /> <br />o <br />o 0.1 0.2 0.3 0.4 0.5 0.6 <br /> <br />EXCEEDANCE PROBABILITY <br /> <br />Figure II - 5 <br /> <br />This shows that the soft channel affords lowest annual cost* <br /> <br />protection below a 0,27 exceedance probability whereas hard channel <br /> <br />is lowest for all other cases. <br /> <br />*Oetermining annual cost involved applying the appropriate discount <br />factor to the present cost of the improvements, See any engineering <br />economics text for details. <br />
The URL can be used to link to this page
Your browser does not support the video tag.