Laserfiche WebLink
<br />C()1MENTARY <br />SHEET 17 OF 45 <br />STATIONS 1402+00 TO STATION 1455+00 <br />"EACH 4 <br /> <br />COST ESTIMATE <br />SHEET 17 OF 45 <br />SOUTH PLATTE RIVF.R <br />STATION 1402+00 TO STATION 1456+00 <br /> <br />CONSTRUCTION <br /> <br />TheSoutbPlatteRlverlnthlsreacbflowstbrougharesldentlal and indus- <br />trial area with nofloodifl<;l prob1ems. <br /> <br />Drainage improvement costs <br />Street crossing costs <br />Utility relocation costs <br /> <br />The recomnended plan Is limited structural Improvements lOhich would lower <br />the water surface elevation and prevent overbank flooding on the left bank <br />at Station 1470 on Sheet 15. Therecorm1endedimprovements include lowering <br />the weir located 100 feet downstream of the Alameda Avenue bridge and a dd- <br />Ing dbodtchute. This weir WdS constructed to protect the foundation of <br />the Alameda bridge and now presents an obstruction to flood flows. In <br />order to provide protection to tbe Alameda Avenue bridge foundations, the <br />channel should be excavated approximately 3 feet and grouted riprap pla ced <br />on the lowered bottombetW€en the !<lair structure and the bridge. It is <br />expect!>d that 1,wering the Alameda Avenue !<Ieir and thecbanne1 under the <br />Alameda Avenue bridge will result in a lowering of the channel upstream. <br />1n addition to lowering the channel bottom, the recoowended plan is to <br />widen the cMnnel to 150 feet and cut back the right bank between the <br />Alameda Avenue bridge and Station 1456. In order to prod de protection <br />against erosion rock riprap should be provided dt the toes of the slopes on <br />both banks as the river degrades, as ,;hownon Oetail 8,Sheet44. <br /> <br />Total construction costs <br /> <br />Eng1neerlng and cont1ngencies <br />(30% of total construction costs) <br /> <br />Property acquisition <br /> <br />TOTAL IMPROVEMENT COSTS <br /> <br />Operation and Maintenance <br /> <br />The first priority for improvements on this sheet is the lowering of the <br />Alalneda Avenue weir dnd installation of the boat chute. In order to pro- <br />tl'ct th.. Al amf'da AVl'nul' bri dgf> it wi 11 bf> Of>CI'~~dr y tn ~ im'lltdnf>OU~ 1 y ex_ <br />cavate the channel and install groutedriprap. \lidening the channel and <br />cutting back the slopes can be implemented at a later date. <br /> <br />The floodp1ai n management strategy for thi S re~Ch is to enforcement of <br />floodplain management regulations. <br /> <br />~225.208 <br />3,375 <br /> <br />228,583 <br /> <br />68,575 <br /> <br />210,000 <br />1507,158 <br />$9,760 <br />