My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD08469
CWCB
>
Floodplain Documents
>
Backfile
>
8001-9000
>
FLOOD08469
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/29/2010 10:15:24 AM
Creation date
10/5/2006 3:40:07 AM
Metadata
Fields
Template:
Floodplain Documents
County
Denver
Jefferson
Adams
Community
Denver, Jefferson County
Stream Name
South Platte River and tributaries
Basin
South Platte
Title
Major Drainageway Planning South Platte Phase B, Volume I
Date
11/1/1985
Prepared For
Denver
Prepared By
Wright Water Engineers, Inc.
Floodplain - Doc Type
Floodplain Report/Masterplan
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
149
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />J-3 <br /> <br />Special1ssues <br />Many special issues needed consideration as a part of this rnaster planning <br />effort to dchieve the stated goal. These include: <br /> <br />f <br /> <br />The objective of the river flow control effort 'll'ould be tooptirnile the <br />South Platte River stre~f1ow frO<rl Chatfield to Brighton for: <br /> <br />o <br />o <br />o <br />o <br />o <br />o <br />o <br />o <br />o <br />o <br />o <br />o <br />o <br /> <br />Flood hydrology and low flow hydrology <br />Hydaulfccharacteristicsofchannel <br />Flood problems <br />Waterdghts <br />Water quality <br />Mineral resources <br />Geomorphology and sedimentation <br />Groundwater <br />Parks, recreation, and boating needs <br />River flow control <br />Sewage effluent dIscharges <br />Aesthetics dnd appearance <br />;oildlifeand aquatic life <br /> <br />River Management <br />In effect, the South Platte Rher Master Plan is to be a long_term road map <br />for the South Platte River. It is toorovide information to understand the <br />problems of the river and to assist in managing and operating the South <br />Platte River from Chatfield R~servoir to BriQhton at Basel ine Road. <br /> <br />o <br /> <br /><later supply <br />Irrigation <br />Aquatic life <br />Recreation and aesthetics <br />Sewage dilution in order to assure good quality water for the <br />above uses <br />Flood control. <br /> <br />o <br /> <br />o <br /> <br />o <br /> <br />o <br /> <br />o <br /> <br />River Flow <br />It was realized early during the course of the study tl1at rnost of th etime <br />there would not be enoul/h water flowing in theriv"r to sati,;fva1l of tile <br />'Jses and at other times there would be too much (i.".,f1O<lding). For that <br />reason it was concluded that implementation of the master plan would re4 <br />q'lirethecooperationofall participants. For river flow control in par- <br />ticular, tile cooperation and assistance of the following agencies would be <br />required: <br /> <br />I <br />I <br /> <br />o OenverWater Board and Department <br />o U.S. Army Corps of Engineers <br />o State Engineer of Colorado <br />o lrrigatorsofagriculturalland <br />o Co 1 orada WIater r.onSf'r~ aU on Board <br />o Urban Drainage ~ Flood Control 01 strict <br />o C"!ntral COlorado WIater Conservancy District <br />
The URL can be used to link to this page
Your browser does not support the video tag.