Laserfiche WebLink
<br />COMMENTARY <br />SKEET 13 OF 45 <br />STATION 1632+00 TO STATION 1686+00 <br />REACH 3 <br /> <br />COST EsTlMATE <br />SHEET 13 OF 45 <br />SOUTH PLATTE RIVER <br />STATION 1632+00 TO STATION 1686+00 <br /> <br />CONSTRUCTION <br /> <br />The 1 and use on both s ides of the ri ~er in thi s reach is prjmari 1 y indus. <br />trial, including the littleton/Englewood sewage treatment plant on the <br />right bank at approximately Station 1645. Little Dry Creek joins the South <br />Platte River at Station 1616 on the right bank. There are no identified <br />flooding problems in this reach. <br /> <br />Orainage impro~ernent costs <br />Street crossing costs <br />Utility relocation costs <br /> <br />Total construction costs <br /> <br />Engineering and contingencies <br />(30% of total construction costs) <br />Property acquisition <br /> <br />The recorrmended plan is to maintain the existing chaMel. Required im. <br />pro~ements include remo~ing the accumulated sediment and debris ..mderneath <br />the Kighway285 and Hamilton Place bridges between Stations 1680 and 1690 <br />and removing the accumulation of trash anddebr1s atapproximatel yStation <br />1678. <br /> <br />TOTAL IMPROVEMENT COSTS <br /> <br />Operation and Maintenance <br /> <br />$11,333 <br /> <br />11,333 <br />3,440 <br /> <br />$14,733 <br /> <br />$7,820 <br />