Laserfiche WebLink
<br />COM"IENTARY <br />SHEET 11 OF 45 <br />STATION 1730+00 TO 1760+00 <br />REACH 2 <br /> <br />COST ESTIMATE <br />SHEET 11 OF 45 <br />SOUTH PLATTE RIVER <br />STATION 1730+00 TO STAT10N 1760+00 <br /> <br />CONSTRUCTION <br /> <br />The recOlll'Tle~ded plan i, the U.S. Army Corp, of Engineers channeli zation <br />project which will providechanne1 ,tabilizat;on and CO!ltain the 100-Yl'ar <br />f1oodwithintheimprovedcha!lnel. <br /> <br />Drainageimprovi!lTlentcosts <br />Street crossing costs <br />Utility relocation costs <br /> <br />Total construction costs <br /> <br />Engineering and contingencies <br />(30% of total COnstruction costs) <br /> <br />Property acquisition <br /> <br />TOTAL IMPROVEMENT COSTS <br /> <br />Operation and Maintenance <br /> <br />, <br /> <br />I <br /> <br />$5,000 <br />