Laserfiche WebLink
<br />COMMENTARY <br />SHEET 9 OF 45 <br />STATIO~ 1804+00 TO 1860+00 <br />RF.A.CH? <br /> <br />COST ESTIMATE <br />SHEET 9 OF 45 <br />SOUTH PLATTE RIVER <br />STATION 1804+00 TO STATION 1860+00 <br /> <br />CONSTRUCTION <br /> <br />The reCOfmlended plan ; ~ the IJ. S. Army Corp~ of Eng i neers channe 1 i zat ion <br />project which will provide Channel stabilization and contain thelOO-year <br />flood within the improved channel. <br /> <br />Drainage improvement costs <br />Street crossing ccsts <br />Utility relocation costs <br />Total construction costs <br /> <br />Engineer1ng and contingencies <br />(30% of total construction costs) <br /> <br />Property acquisition <br /> <br />TOTAL IMPROVEMENT COSTS <br /> <br />Operation and Ma1ntenance <br /> <br />I <br /> <br />$14.000 <br />