My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD08469
CWCB
>
Floodplain Documents
>
Backfile
>
8001-9000
>
FLOOD08469
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/29/2010 10:15:24 AM
Creation date
10/5/2006 3:40:07 AM
Metadata
Fields
Template:
Floodplain Documents
County
Denver
Jefferson
Adams
Community
Denver, Jefferson County
Stream Name
South Platte River and tributaries
Basin
South Platte
Title
Major Drainageway Planning South Platte Phase B, Volume I
Date
11/1/1985
Prepared For
Denver
Prepared By
Wright Water Engineers, Inc.
Floodplain - Doc Type
Floodplain Report/Masterplan
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
149
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />,., <br /> <br />Erosion dnd sedimentation problems should be minimized. <br /> <br />PRINCIPLES <br />flood control is d $ubsystem Of the total urban system. <br /> <br />o Flood control 1s d space allocation and ruooff maniIJenent profile-n. <br />o Floodwaters and urban runoff are resources which,whenmanaged, <br />should contribute to the well being of the nen~er region. <br />o The flood cOr'ltrol management strategy should be a m(J1ti~p(Jrpose <br />and m(Jlti~means effort. <br /> <br />Conflicting d",nands on the limited waters of the South Platte River should <br />be optimized. WildlHe and riparian ~egetation conditions should be im* <br />proved. Changes to the ri ver shoul d be cons; s tent with overa 11 reg i on ~ 1 <br />goals and objectives. <br /> <br />GOALS <br /> <br />OBJECTIVES <br />One-Hundred Year Design Flood. The lOO_yearf1oodshouldbethebasisfor <br />floodplain planning In the South Platte River corridor. Theonepercent <br />cr1terion means that ramifications of the laO-year flood must always be <br />evaluated as to impact and land use optimization. It does!l2.irnean that <br />overballk flooding during the lOa-year flood must be eliminated. <br /> <br />The planning and engineering for the South Platte River should reduce <br />future flood damage while systematically reducing existing flood damage <br />potential. <br /> <br />Well balanced, non-structural and structural means should be utilized to <br />reduce flood problems. Exposure Of peopie and property to flood halards <br />should lle reduced. <br /> <br />Transportation. Roads, highways, and bridges should not cause flood prob_ <br />lems or increase flood related damages. Transportation should not conflict <br />with the recreational and park use of the corridor withOut mitigation <br />measures. ~ridqe crossings of the South Pl atte River should not cause <br />backwater effects and should have piers and abutments designed to resist <br />erosion by the river. <br /> <br />TIle flood management of the South Platte River should be coordinated with <br />water supply, sewerage, land use, building development, recreation, trans_ <br />portation,wiidlife, and open space planning programs of themetr o area. <br /> <br />Eros ion and Sed imentation , Bed and bank cutt i nq by the ri ~er. and re 1 ated <br />sediment deposition effects should be oninimized. EroSion and sedimentation <br />causing acti~ities affect safe flood carrying capacity and therefore should <br />be subject to f100d control regulations. <br /> <br />Tneexisting floodplains from Chatfield OillltO Columbine Valley, and from <br />Sand Creek to Brighton ~hould be permanently managed and regulated. El se- <br />where, regulation should constitute an interim measure untii loo-year <br />channel impro~ements are made. <br /> <br />Access Trai 1. Access to the ri~er should be ma inta; fled for operational and <br />maintenance purpose~, and to afford ready inspect ion of prOblem areas. <br />Such access trails shall,where practical, ,,,,rye amulti_use-functionfof <br />hiking and runnin9. biking, and non-motorized transportation. <br /> <br />TIle potenti al of the ri~er corridor for parks and recreation should be ex- <br />ploited to increase land values, sodal harmony, health and to r!'<'Juce <br />t.lepende"~t' 0" the dutumubi 1e. <br /> <br />Continuous Linear Boating. Safety and enjoyment M the river ~hould be <br />pro~ided for cont inuous boati ng through the Denver area. All OifllS and <br />cneddd<l1sshuuld have safe hoat chutes s<Jitahle for tne typical boater for <br />
The URL can be used to link to this page
Your browser does not support the video tag.